Use of day-ahead load forecasting for predicted cable rating

R. Huang, J. Pilgrim, P. Lewin, D. Scott, D. Morrice
{"title":"Use of day-ahead load forecasting for predicted cable rating","authors":"R. Huang, J. Pilgrim, P. Lewin, D. Scott, D. Morrice","doi":"10.1109/ISGTEUROPE.2014.7028813","DOIUrl":null,"url":null,"abstract":"In recent years, increasing attention has been placed on cable dynamic rating systems in an attempt to increase asset utilization and decrease constraint costs. In this work, the concept of Predicted Cable Rating system is introduced by building day-ahead load prediction into the dynamic rating system to perform day-ahead rating prediction. This allows the cable rating being calculated forward from any point within the next 24 hours. The method is applied to a cable tunnel system to investigate the likely errors in temperature prediction which may arise, with good performance being demonstrated.","PeriodicalId":299515,"journal":{"name":"IEEE PES Innovative Smart Grid Technologies, Europe","volume":"26 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-10-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE PES Innovative Smart Grid Technologies, Europe","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISGTEUROPE.2014.7028813","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

In recent years, increasing attention has been placed on cable dynamic rating systems in an attempt to increase asset utilization and decrease constraint costs. In this work, the concept of Predicted Cable Rating system is introduced by building day-ahead load prediction into the dynamic rating system to perform day-ahead rating prediction. This allows the cable rating being calculated forward from any point within the next 24 hours. The method is applied to a cable tunnel system to investigate the likely errors in temperature prediction which may arise, with good performance being demonstrated.
使用日前负荷预测预测电缆额定功率
近年来,为了提高资产利用率和降低约束成本,电缆动态评级系统受到越来越多的关注。本文将预测电缆额定功率系统的概念引入动态额定功率系统,在动态额定功率系统中建立日前负荷预测,进行日前额定功率预测。这允许在接下来的24小时内从任何点向前计算电缆等级。将该方法应用于某电缆隧道系统中,分析了温度预测中可能出现的误差,并取得了良好的效果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信