Agents, Techniques, and Tools of Projectification

Dalia Mukhtar-Landgren, M. Fred
{"title":"Agents, Techniques, and Tools of Projectification","authors":"Dalia Mukhtar-Landgren, M. Fred","doi":"10.4324/9781315098586-11","DOIUrl":null,"url":null,"abstract":"While previous research on projectification tends to focus on why processes of projectification emerge and in what contexts, this chapter use the example of European Union (EU) project funding in Swedish local government to analyse and understand how processes of projectification unfold in terms of transformation and adaptation. Key agents in processes of projectification are located and how these agents work and with what techniques and tools are described and analysed. It is argued that processes of projectification unfold through the workings of agents sharing, at the same time as constructing, a project funding market in which they mediate between EU funding and possible EU projects. The EU project funding market is held together by mediating agents and their application of policy techniques and tools of information, roadmaps/policies, collaborations/networks, courses, and consultation. Processes of projectification are as such triggered by project-supporting incentives created top-down at the same time as several bottom-up initiatives trigger the same phenomenon. As a result, projectification is understood not only as an increasing use of EU projects but as processes of transformation and adaptation where agents create project strategies, project models, engage in project networks and train staff in project management and project methodology to handle forthcoming projects. (Less)","PeriodicalId":383900,"journal":{"name":"The Projectification of the Public Sector","volume":"108 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-03-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Projectification of the Public Sector","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4324/9781315098586-11","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

Abstract

While previous research on projectification tends to focus on why processes of projectification emerge and in what contexts, this chapter use the example of European Union (EU) project funding in Swedish local government to analyse and understand how processes of projectification unfold in terms of transformation and adaptation. Key agents in processes of projectification are located and how these agents work and with what techniques and tools are described and analysed. It is argued that processes of projectification unfold through the workings of agents sharing, at the same time as constructing, a project funding market in which they mediate between EU funding and possible EU projects. The EU project funding market is held together by mediating agents and their application of policy techniques and tools of information, roadmaps/policies, collaborations/networks, courses, and consultation. Processes of projectification are as such triggered by project-supporting incentives created top-down at the same time as several bottom-up initiatives trigger the same phenomenon. As a result, projectification is understood not only as an increasing use of EU projects but as processes of transformation and adaptation where agents create project strategies, project models, engage in project networks and train staff in project management and project methodology to handle forthcoming projects. (Less)
投影的代理、技术和工具
虽然之前关于项目化的研究倾向于关注项目化过程为何出现以及在什么背景下出现,但本章以欧盟(EU)项目资助瑞典地方政府为例,分析和理解项目化过程如何在转型和适应方面展开。投影过程中的关键代理人被定位,这些代理人是如何工作的,用什么技术和工具被描述和分析。有人认为,项目化的过程是通过代理人的工作展开的,在构建项目融资市场的同时,他们在欧盟融资和可能的欧盟项目之间进行调解。欧盟项目融资市场由中介机构及其政策技术和信息、路线图/政策、合作/网络、课程和咨询工具的应用联系在一起。项目化过程同样是由自上而下的项目支持激励触发的,同时几个自下而上的主动性也触发了同样的现象。因此,项目化不仅被理解为越来越多地使用欧盟项目,而且被理解为转型和适应的过程,其中代理人创建项目战略、项目模型、参与项目网络并培训项目管理人员和项目方法,以处理即将到来的项目。(少)
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信