{"title":"A method for obtaining the residual load duration curve of the project power after the completion of a run-off-river hydro-power.","authors":"T. Okubo","doi":"10.2208/JSCEJ1949.1959.65_25","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":430816,"journal":{"name":"Memoirs of the Faculty of Engineering, Kyoto University","volume":"14 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1959-11-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Memoirs of the Faculty of Engineering, Kyoto University","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2208/JSCEJ1949.1959.65_25","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}