Evaluation of soil replacement and cement grout injection in soil settlement

Arief Andriansyah, L. Afriani, D. Kusumastuti, E. P. Wahono
{"title":"Evaluation of soil replacement and cement grout injection in soil settlement","authors":"Arief Andriansyah, L. Afriani, D. Kusumastuti, E. P. Wahono","doi":"10.23960/josst.v1i2.9","DOIUrl":null,"url":null,"abstract":"This paper discusses the process of original soil stabilization in Trans Sumatra Bakauheni-Terbanggi Besar Toll Road Project Package 2 Sidomulyo-Kotabaru. The soil replacement process was conducted at approximately 24 kilometres along the toll’s main road. The original soil bearing capacity analysis stage was by performing a Dynamic Cone Penetrometer (DCP) and Sondir test to analyze the deep of hard soil. A soil replacement was carried out to replace the original soil with soil that has appropriate specification. the piling up process was conducted in stages, which has Sandstone in such of the layer. The research done about the landfill sample was retaken and collected at 68 points. The stockpile soil samples collection was then followed by the analysis which was conducted in the laboratory to find the soil bearing capacity. There are 4 types of bearing capacity parameters analyzed, namely specific gravity, water content, aggregate analysis (Sieve Analysis), and consistency limit (Atterberg Limit). Referring to it, then there was the classification of soil types according to AASHTO M145 & Casagrande Soil Classification System. A point that has settlement after soil replacement is STA 52+000. So, there need to add soil stabilization, that is cement grout injection. Researchers analyzed the soil settlement by interpretation method. Results showed that soil replacement and cement grout injection could decrease a soil settlement by about 15.07 cm to become 0.93 cm.","PeriodicalId":153391,"journal":{"name":"Journal of Sustainability Science and Technology","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-12-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Sustainability Science and Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.23960/josst.v1i2.9","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This paper discusses the process of original soil stabilization in Trans Sumatra Bakauheni-Terbanggi Besar Toll Road Project Package 2 Sidomulyo-Kotabaru. The soil replacement process was conducted at approximately 24 kilometres along the toll’s main road. The original soil bearing capacity analysis stage was by performing a Dynamic Cone Penetrometer (DCP) and Sondir test to analyze the deep of hard soil. A soil replacement was carried out to replace the original soil with soil that has appropriate specification. the piling up process was conducted in stages, which has Sandstone in such of the layer. The research done about the landfill sample was retaken and collected at 68 points. The stockpile soil samples collection was then followed by the analysis which was conducted in the laboratory to find the soil bearing capacity. There are 4 types of bearing capacity parameters analyzed, namely specific gravity, water content, aggregate analysis (Sieve Analysis), and consistency limit (Atterberg Limit). Referring to it, then there was the classification of soil types according to AASHTO M145 & Casagrande Soil Classification System. A point that has settlement after soil replacement is STA 52+000. So, there need to add soil stabilization, that is cement grout injection. Researchers analyzed the soil settlement by interpretation method. Results showed that soil replacement and cement grout injection could decrease a soil settlement by about 15.07 cm to become 0.93 cm.
土壤沉降补土与注浆效果评价
本文讨论了跨苏门答腊Bakauheni-Terbanggi Besar收费公路二期工程sidomulya - kotabaru的原始土壤稳定过程。土壤置换过程在收费主干道沿线约24公里处进行。原来的土壤承载力分析阶段是通过动态锥贯仪(DCP)和Sondir试验对硬土深度进行分析。进行了土壤置换,用合适规格的土壤代替原有土壤。堆积过程是分阶段进行的,在这一层中有砂岩。在68个点对垃圾填埋场样本进行了重新采集。储存的土壤样品采集后,在实验室进行分析,以确定土壤的承载能力。分析了4种承载力参数,即比重、含水量、骨料分析(筛分分析)和一致性极限(阿特伯格极限)。在此基础上,根据AASHTO M145和Casagrande土壤分类系统对土壤类型进行了分类。换土后沉降点STA 52+000。因此,还需要添加稳定土,即注入水泥浆。研究人员采用解译法对土壤沉降进行了分析。结果表明:换土加注浆可使土体沉降减少约15.07 cm,变为0.93 cm;
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信