{"title":"Executing process models: activity and project management","authors":"G. Chroust, Stefan Hardt","doi":"10.1109/ECBS.1996.494562","DOIUrl":null,"url":null,"abstract":"Developing software products is both a technical and a managerial challenge. The integration of these two areas (the logical/technical prescription of the process model with the resource-oriented planning and control of project management), however, still needs further discussion and clarification. We discuss the relation of the components of a software development process and their counterparts in project management. We also show how an integrated software engineering environment handles software process enactment based on both activities defined via a process model and on requirements resulting from project management.","PeriodicalId":244671,"journal":{"name":"Proceedings IEEE Symposium and Workshop on Engineering of Computer-Based Systems","volume":"62 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1996-03-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"9","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings IEEE Symposium and Workshop on Engineering of Computer-Based Systems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ECBS.1996.494562","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 9
Abstract
Developing software products is both a technical and a managerial challenge. The integration of these two areas (the logical/technical prescription of the process model with the resource-oriented planning and control of project management), however, still needs further discussion and clarification. We discuss the relation of the components of a software development process and their counterparts in project management. We also show how an integrated software engineering environment handles software process enactment based on both activities defined via a process model and on requirements resulting from project management.