{"title":"Weyerhaeuser, Dryden Operations Improved Power Distribution System Reliability A Case Study","authors":"T. Branch","doi":"10.1109/PAPCON.2006.1673765","DOIUrl":null,"url":null,"abstract":"The paper presents a case study to show how Weyerhaeuser, Dryden Operations improved its power distribution system reliability. This paper focused mainly on the changes that were made on the 115 kV and 13.2 kV power distribution systems. The protection and synchronizing schemes were discussed, and the author shows how the addition of circuit switchers provided flexibility to perform maintenance on the incoming 115 kV/13.2 kV power transformers without interrupting mill operations","PeriodicalId":231751,"journal":{"name":"Conference Record of 2006 Annual Pulp and Paper Industry Technical Conference","volume":"13 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-06-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Conference Record of 2006 Annual Pulp and Paper Industry Technical Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PAPCON.2006.1673765","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

The paper presents a case study to show how Weyerhaeuser, Dryden Operations improved its power distribution system reliability. This paper focused mainly on the changes that were made on the 115 kV and 13.2 kV power distribution systems. The protection and synchronizing schemes were discussed, and the author shows how the addition of circuit switchers provided flexibility to perform maintenance on the incoming 115 kV/13.2 kV power transformers without interrupting mill operations
改进配电系统可靠性的案例研究
本文通过一个案例分析,展示了惠好公司如何提高其配电系统的可靠性。本文主要介绍了115千伏和13.2千伏配电系统的变化。讨论了保护和同步方案,作者展示了电路开关的增加如何在不中断工厂运行的情况下,为进线115 kV/13.2 kV电力变压器的维护提供了灵活性
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信