A new profit-based unit commitment considering power and reserve generating

P. Attaviriyanupap, H. Kita, E. Tanaka, J. Hasegawa
{"title":"A new profit-based unit commitment considering power and reserve generating","authors":"P. Attaviriyanupap, H. Kita, E. Tanaka, J. Hasegawa","doi":"10.1109/PESW.2002.985227","DOIUrl":null,"url":null,"abstract":"Because of the revolution of power system structure nowadays, operation and control of generating units must be modified. Energy price becomes an important parameter to make a decision in this restructured system. Unit commitment (UC) in such a competitive environment is no longer the same as the traditional one. The objective of UC is not to minimize production cost as before but to find the solution that produces a maximum profit for generation company (GENCO). This paper presents a new profit-based UC formulation under competitive environment considering both power and reserve generation. A hybrid method between Lagrange relaxation (LR) and evolutionary programming (EP) is applied to solve this new UC problem. The proposed approach is applied to a test system. Simulation results are compared with those obtained from traditional UC.","PeriodicalId":198760,"journal":{"name":"2002 IEEE Power Engineering Society Winter Meeting. Conference Proceedings (Cat. No.02CH37309)","volume":"30 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2002-08-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"39","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2002 IEEE Power Engineering Society Winter Meeting. Conference Proceedings (Cat. No.02CH37309)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PESW.2002.985227","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 39

Abstract

Because of the revolution of power system structure nowadays, operation and control of generating units must be modified. Energy price becomes an important parameter to make a decision in this restructured system. Unit commitment (UC) in such a competitive environment is no longer the same as the traditional one. The objective of UC is not to minimize production cost as before but to find the solution that produces a maximum profit for generation company (GENCO). This paper presents a new profit-based UC formulation under competitive environment considering both power and reserve generation. A hybrid method between Lagrange relaxation (LR) and evolutionary programming (EP) is applied to solve this new UC problem. The proposed approach is applied to a test system. Simulation results are compared with those obtained from traditional UC.
考虑电力和备用发电的新的以利润为基础的单位承诺
由于当今电力系统结构的变革,发电机组的运行和控制必须进行变革。能源价格成为该体制改革决策的重要参数。在这种竞争环境下,单位承诺(UC)已不再是传统的承诺。UC的目标不是像以前那样最小化生产成本,而是找到为发电公司(GENCO)产生最大利润的解决方案。本文提出了一种考虑发电和备用发电的竞争环境下以利润为基础的统一成本核算方法。采用拉格朗日松弛(LR)和进化规划(EP)的混合方法来解决这一新的UC问题。将该方法应用于一个测试系统。仿真结果与传统UC的仿真结果进行了比较。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信