Deadline assignment in a distributed soft real-time system

B. Kao, H. Garcia-Molina
{"title":"Deadline assignment in a distributed soft real-time system","authors":"B. Kao, H. Garcia-Molina","doi":"10.1109/ICDCS.1993.287682","DOIUrl":null,"url":null,"abstract":"In a distributed environment, tasks often have processing demands on multiple sites. A distributed task is usually divided up into several subtasks, each one to be executed at some site in order. In a real-time system, an overall deadline is usually specified by an application designer indicating when a distributed task is to be finished. To study the subtask deadline assignment problem a simple model of the system and tasks is postulated. The focus is on soft real-time systems. In such systems, it is very difficult to guarantee that all deadlines will be met, and hence one tries to minimize the number of deadlines that are missed. The authors examine (through simulations) four strategies for subtask deadline assignment in a distributed soft real-time environment.<<ETX>>","PeriodicalId":249060,"journal":{"name":"[1993] Proceedings. The 13th International Conference on Distributed Computing Systems","volume":"16 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1993-05-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"271","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"[1993] Proceedings. The 13th International Conference on Distributed Computing Systems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICDCS.1993.287682","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 271

Abstract

In a distributed environment, tasks often have processing demands on multiple sites. A distributed task is usually divided up into several subtasks, each one to be executed at some site in order. In a real-time system, an overall deadline is usually specified by an application designer indicating when a distributed task is to be finished. To study the subtask deadline assignment problem a simple model of the system and tasks is postulated. The focus is on soft real-time systems. In such systems, it is very difficult to guarantee that all deadlines will be met, and hence one tries to minimize the number of deadlines that are missed. The authors examine (through simulations) four strategies for subtask deadline assignment in a distributed soft real-time environment.<>
分布式软实时系统的最后期限分配
在分布式环境中,任务通常在多个站点上具有处理需求。一个分布式任务通常被分成几个子任务,每个子任务依次在某个站点执行。在实时系统中,总体截止日期通常由应用程序设计人员指定,指示何时完成分布式任务。为了研究子任务期限分配问题,建立了系统和任务的简单模型。重点是软实时系统。在这样的系统中,很难保证满足所有的截止日期,因此要尽量减少错过的截止日期。通过仿真研究了分布式软实时环境下子任务期限分配的四种策略。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信