{"title":"Research on process optimization for equipment maintenance based on lean six sigma management","authors":"Deyong Zhao, Weimin Ye, Cuijuan Gao","doi":"10.1109/ICQR2MSE.2012.6246467","DOIUrl":null,"url":null,"abstract":"In order to optimize the process of equipment maintenance and improve the maintenance efficiency effectively, by the four steps of choosing the method of DOE, fitting the model, analyzing the residual and optimizing the result, equipment maintenance process optimization model method under equipment maintenance lean six sigma project is established based on design of experiment (DOE). Via taking a certain equipment maintenance technique parameters optimization as an illustrative example, the optimization model which can provide a new method for the optimizing of equipment maintenance process in lean six sigma project is proved to be scientific, valid, and well applicable finally.","PeriodicalId":401503,"journal":{"name":"2012 International Conference on Quality, Reliability, Risk, Maintenance, and Safety Engineering","volume":"30 4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-06-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"8","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 International Conference on Quality, Reliability, Risk, Maintenance, and Safety Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICQR2MSE.2012.6246467","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 8
Abstract
In order to optimize the process of equipment maintenance and improve the maintenance efficiency effectively, by the four steps of choosing the method of DOE, fitting the model, analyzing the residual and optimizing the result, equipment maintenance process optimization model method under equipment maintenance lean six sigma project is established based on design of experiment (DOE). Via taking a certain equipment maintenance technique parameters optimization as an illustrative example, the optimization model which can provide a new method for the optimizing of equipment maintenance process in lean six sigma project is proved to be scientific, valid, and well applicable finally.
为了优化设备维修工艺,有效提高维修效率,通过选择 DOE 方法、拟合模型、分析残差和优化结果四个步骤,建立了基于实验设计(DOE)的设备维修精益六西格玛项目下的设备维修工艺优化模型方法。以某设备维修工艺参数优化为例,证明了该优化模型的科学性、有效性和适用性,为精益六西格玛项目下的设备维修工艺优化提供了一种新的方法。