{"title":"PENGUJIAN ELEKTRIK MOTOR INDUKSI 3 PHASE ROTOR SANGKAR 75 KW DI PT MESINDO TEKNINESIA","authors":"Dahliya Sulastri, I. Darmawan","doi":"10.24912/tesla.v24i1.13498","DOIUrl":null,"url":null,"abstract":"In the schematic of the electric motor repair procedure, it can be explained that the repair process can be divided into four handling parts, which include operations, quality control, mechanical and electrical. induction before and after repair. The data taken is the data of the 380V cage induction motor belonging to PLTU Indramayu. In the testing process both before and after the repair there are several measurements, namely: Insulation Resistance Test, Resistance Test, Winding Wave Test Running test. In the insulation resistance test, the results obtained are an average of 2000 MΩ or above 100 MΩ so that the stator after being repaired is in good condition, as well as the results of the resistance test, the result is that the deviation balance between the coils is not more than 5%. The results of the Surge test after the repair also showed that there was no noise and good, for the results of the motor rotation test, vibration and temperature, all of them were in accordance with the 2015 EASA AR100 standard. Inspection of the motor before repairing (electrical test before repairing) must be more thorough because the inspection become the basis for determining what process will be carried out nextABSTRAK:Pada skema prosedur perbaikan motor listrik dapat dijelaskan bahwa proses perbaikan dapat di bagi menjadi empat bagian penanganan yaitu meliputi operasional, quality control, mechanical dan electrical Penelitian dilaksanakan di PT Mesindo Tekninesia departemen QC (Quality Control) yaitu penelitian yang dilakukan secara langsung tentang pengujian elektrik motor induksi sebelum perbaikan dan setelah perbaikan. Data yang diambil adalah data motor induksi sangkar 380V milik PLTU Indramayu. Dalam proses pengujian baik sebelum maupun sesudah perbaikan terdapat beberapa pengukuran yaitu:Tes Tahanan Isolasi,Tes Resistansi ,Tes Gelombang Belitan Running test. Pada pengujian insulation resistance hasil yang didapat rata-rata 2000 MΩ atau berada diatas 100 MΩ sehingga stator setelah diperbaiki dalam keadaan bagus, begitupun pada hasil resistance Test hasilnya yaitu balance deviasi antar coil tidak lebih dari 5%. Hasil Surge test setelah perbaikan pun menunjukkan bahwa tidak ada noise dan baik, untuk hasil dari pengujian putaran motor, getaran dan suhu semuanya sudah sesuai dengan standar EASA AR100 2015. Pemerikasaan motor sebelum diperbaiki (electrical test before repairing) harus lebih teliti lagi karena pemeriksaan tersebut menjadi dasar penentu untuk proses apa yang akan dilakukan selanjutnya","PeriodicalId":273497,"journal":{"name":"TESLA: Jurnal Teknik Elektro","volume":"11 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-04-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"TESLA: Jurnal Teknik Elektro","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24912/tesla.v24i1.13498","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
In the schematic of the electric motor repair procedure, it can be explained that the repair process can be divided into four handling parts, which include operations, quality control, mechanical and electrical. induction before and after repair. The data taken is the data of the 380V cage induction motor belonging to PLTU Indramayu. In the testing process both before and after the repair there are several measurements, namely: Insulation Resistance Test, Resistance Test, Winding Wave Test Running test. In the insulation resistance test, the results obtained are an average of 2000 MΩ or above 100 MΩ so that the stator after being repaired is in good condition, as well as the results of the resistance test, the result is that the deviation balance between the coils is not more than 5%. The results of the Surge test after the repair also showed that there was no noise and good, for the results of the motor rotation test, vibration and temperature, all of them were in accordance with the 2015 EASA AR100 standard. Inspection of the motor before repairing (electrical test before repairing) must be more thorough because the inspection become the basis for determining what process will be carried out nextABSTRAK:Pada skema prosedur perbaikan motor listrik dapat dijelaskan bahwa proses perbaikan dapat di bagi menjadi empat bagian penanganan yaitu meliputi operasional, quality control, mechanical dan electrical Penelitian dilaksanakan di PT Mesindo Tekninesia departemen QC (Quality Control) yaitu penelitian yang dilakukan secara langsung tentang pengujian elektrik motor induksi sebelum perbaikan dan setelah perbaikan. Data yang diambil adalah data motor induksi sangkar 380V milik PLTU Indramayu. Dalam proses pengujian baik sebelum maupun sesudah perbaikan terdapat beberapa pengukuran yaitu:Tes Tahanan Isolasi,Tes Resistansi ,Tes Gelombang Belitan Running test. Pada pengujian insulation resistance hasil yang didapat rata-rata 2000 MΩ atau berada diatas 100 MΩ sehingga stator setelah diperbaiki dalam keadaan bagus, begitupun pada hasil resistance Test hasilnya yaitu balance deviasi antar coil tidak lebih dari 5%. Hasil Surge test setelah perbaikan pun menunjukkan bahwa tidak ada noise dan baik, untuk hasil dari pengujian putaran motor, getaran dan suhu semuanya sudah sesuai dengan standar EASA AR100 2015. Pemerikasaan motor sebelum diperbaiki (electrical test before repairing) harus lebih teliti lagi karena pemeriksaan tersebut menjadi dasar penentu untuk proses apa yang akan dilakukan selanjutnya
在电机维修程序原理图中可以说明,维修过程可分为操作、质量控制、机械和电气四个处理部分。维修前后感应。所取数据为PLTU Indramayu公司380V笼型感应电动机的数据。在检修前后的测试过程中有几项测量,即:绝缘电阻测试、电阻测试、绕组波测试、运行测试。在绝缘电阻测试中,得到的结果是平均2000 MΩ或100 MΩ以上,使修复后的定子处于良好状态,以及电阻测试的结果,结果是线圈之间的偏差平衡不大于5%。维修后的Surge测试结果也显示没有噪音,良好,对于电机旋转测试,振动和温度的结果,都符合2015年EASA AR100标准。修理前对电机的检查(修理前的电气试验)必须更彻底,因为检查成为决定下一步将进行什么工序的基础。机械和电气部门QC(质量控制)yitu Penelitian yang dilakakkan secara langsung tentang penguin elektrik motor induksi sebelum perbaikan dan setelah perbaikan。数据杨diambil adalah数据马达工业sangkar 380V牛奶PLTU Indramayu。Dalam教授企鹅baik sebelum maupun sesudah perbaikan terdapat beberapa pengukuran yaitu:Tes Tahanan Isolasi,Tes Resistansi,Tes Gelombang Belitan跑步测试。企鹅绝缘电阻hasil yang didapat rata-rata 2000 MΩ企鹅绝缘电阻100 MΩ企鹅定子setelah diperbaiki dalam keadaan bagus,企鹅绝缘电阻测试hasilnya yaitu平衡偏差,企鹅线圈tidak lebih达5%。Hasil浪涌测试setelah perbaikan pun menunjukkan bahwa tidak ada noise danbaik, untuk Hasil dari penguian putaran马达,getaran dansuhu semuanya sudah sessuai denan标准EASA AR100 2015。Pemerikasaan电机sebelum diperbaiki(修理前的电气测试)harus lebih teliti lagi karena pemeriksaan和tersebut menjadi dasar penentu untuk proproas yang akan dilakukan selanjutnya