Earned Value Concept as a Method to Analyze Cost and Time Control

Budi Utomo, Kartono Wibowo, Soedarsono S
{"title":"Earned Value Concept as a Method to Analyze Cost and Time Control","authors":"Budi Utomo, Kartono Wibowo, Soedarsono S","doi":"10.30659/jacee.5.2.103-112","DOIUrl":null,"url":null,"abstract":"The successful construction of infrastructure is dependent on many aspects, including at least time, cost, and control. With good control, deviations during the execution of work are expected to be minimized. In the case of the \"MAS BIMACIKA\" Service Office Building Construction project, acceleration of construction becomes an issue. Acceleration needs more resources than normal conditions, the addition of resources is required to achieve productivity value as planned. This study aimed to examine time and cost performance in the \"MAS BIMACIKA\" Service Office Building Construction Project. The Earned Value Concept, and the Crashing and Overlapping method used to analyze the costs resulting from the acceleration of work, were adopted in the process of controlling. Budget Cost of Work Schedule, Budget Cost of Work Performance, and Actual Cost of Work Performance were the parameters of the study. From the results of the analysis carried out until week 5, it is observed that the work could be completed earlier. This condition is indicated by the value of BCWP which is higher than BCWS. However, from the cost perspective, the construction resulted in wastage. This finding is confirmed by the value as shown in BCWP which is below ACWP. The analysis results until the 10th week show that the work could be completed earlier. This finding is indicated by the value of BCWP which is higher than BCWS. In terms of costs, the contractors still gained profit. This statement is supported by the value of ACWP which is below BCWP.","PeriodicalId":349112,"journal":{"name":"Journal of Advanced Civil and Environmental Engineering","volume":"4 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-11-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Advanced Civil and Environmental Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30659/jacee.5.2.103-112","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The successful construction of infrastructure is dependent on many aspects, including at least time, cost, and control. With good control, deviations during the execution of work are expected to be minimized. In the case of the "MAS BIMACIKA" Service Office Building Construction project, acceleration of construction becomes an issue. Acceleration needs more resources than normal conditions, the addition of resources is required to achieve productivity value as planned. This study aimed to examine time and cost performance in the "MAS BIMACIKA" Service Office Building Construction Project. The Earned Value Concept, and the Crashing and Overlapping method used to analyze the costs resulting from the acceleration of work, were adopted in the process of controlling. Budget Cost of Work Schedule, Budget Cost of Work Performance, and Actual Cost of Work Performance were the parameters of the study. From the results of the analysis carried out until week 5, it is observed that the work could be completed earlier. This condition is indicated by the value of BCWP which is higher than BCWS. However, from the cost perspective, the construction resulted in wastage. This finding is confirmed by the value as shown in BCWP which is below ACWP. The analysis results until the 10th week show that the work could be completed earlier. This finding is indicated by the value of BCWP which is higher than BCWS. In terms of costs, the contractors still gained profit. This statement is supported by the value of ACWP which is below BCWP.
挣值概念:分析成本和时间控制的方法
基础设施的成功建设取决于许多方面,至少包括时间、成本和控制。在良好的控制下,工作执行过程中的偏差有望被最小化。以“MAS BIMACIKA”服务型办公楼建设项目为例,加快建设成为一个问题。加速比正常情况下需要更多的资源,需要额外的资源才能按计划实现生产价值。本研究旨在检验MAS BIMACIKA服务型办公楼建设项目的时间与成本绩效。在控制过程中采用挣值概念,并采用碰撞重叠法分析因工作加速而产生的成本。工作进度预算成本、工作绩效预算成本和实际工作绩效成本是研究的参数。从进行到第5周的分析结果来看,这项工作可以更早完成。这种情况由BCWP的值高于BCWS来表示。然而,从成本的角度来看,施工造成了浪费。BCWP低于ACWP的数值证实了这一发现。直到第10周的分析结果表明,工作可以提前完成。BCWP值高于BCWS值表明了这一发现。在成本方面,承包商仍然获得了利润。此语句由ACWP的值支持,该值低于BCWP。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信