{"title":"Existing mill capacity doubled developments in grinding process","authors":"S. Strasser","doi":"10.1109/CITCON.2002.1006508","DOIUrl":null,"url":null,"abstract":"The tube mill is still the most common machine in the cement industry for grinding clinker. Large scale production upgrades of tube mills have been available since 1990, when the roller press has been set up for semi-finish-grinding. The major reasons for upgradings are: production increase, lower energy consumption and the market demand for higher cement qualities. All three arguments should be fulfilled for the cement mill conversion, introduced in the paper. A pregrinding circuit, consisting of a roller press and a separator has been selected, to more than double the capacity of the existing tube mill. While this project was one of the first of its nature, a number of problems have been encountered. Finally, a second upgrading step had to follow the first one, partly replacing major equipment. A new process, even new machines have been introduced, giving satisfactory results. Finally, it has become a new standard for todays applications. The project introduced is an example for a number of grinding plants that still need the second step of upgrade.","PeriodicalId":103359,"journal":{"name":"IEEE-IAS/PCS 2002 Cement Industry Technical Conference. Conference Record (Cat. No.02CH37282)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2002-08-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE-IAS/PCS 2002 Cement Industry Technical Conference. Conference Record (Cat. No.02CH37282)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CITCON.2002.1006508","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

Abstract

The tube mill is still the most common machine in the cement industry for grinding clinker. Large scale production upgrades of tube mills have been available since 1990, when the roller press has been set up for semi-finish-grinding. The major reasons for upgradings are: production increase, lower energy consumption and the market demand for higher cement qualities. All three arguments should be fulfilled for the cement mill conversion, introduced in the paper. A pregrinding circuit, consisting of a roller press and a separator has been selected, to more than double the capacity of the existing tube mill. While this project was one of the first of its nature, a number of problems have been encountered. Finally, a second upgrading step had to follow the first one, partly replacing major equipment. A new process, even new machines have been introduced, giving satisfactory results. Finally, it has become a new standard for todays applications. The project introduced is an example for a number of grinding plants that still need the second step of upgrade.
现有的磨矿产能使研磨工艺的发展翻了一番
管磨机仍然是水泥工业中最常用的磨熟料的机器。自1990年以来,管材轧机已经进行了大规模的生产升级,当时设置了辊压机进行半精磨。升级改造的主要原因是:产量增加、能耗降低和市场对水泥质量的需求提高。本文介绍的水泥厂改造应满足这三个条件。选择了由辊压机和分离器组成的预磨回路,使现有管磨机的产能增加一倍以上。虽然这个项目是其性质的第一个项目之一,但遇到了许多问题。最后,在第一次升级之后必须进行第二次升级,部分更换主要设备。引进了新工艺,甚至新机器,取得了令人满意的效果。最后,它已成为当今应用程序的新标准。所介绍的项目是一些仍需进行第二步改造的磨矿厂的一个例子。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信