An Alternative Method for Accelerated Reliability Testing of Energy Meter in PLN Indonesia

A. P. Purnomoadi, G. Supriyadi, B. S. Munir
{"title":"An Alternative Method for Accelerated Reliability Testing of Energy Meter in PLN Indonesia","authors":"A. P. Purnomoadi, G. Supriyadi, B. S. Munir","doi":"10.1109/APCoRISE46197.2019.9318789","DOIUrl":null,"url":null,"abstract":"An energy meter should continuously provide a good-accuracy as any deviation contributes to the company (or customer) loss. One approach to estimate the reliability of the meter is through the accelerated reliability testing. During the test, samples are tested inside a climatic-chamber with humidity and temperature above the operating conditions. The known testing procedures based on the IEC 62059-31-1:2008, however, is time-consuming. Some reasons are due to the daily-interval checking for all samples and the combination number of over-stresses in the test. For these reasons, the PLN proposed an alternative method by which it employs only the maximum temperature and humidity overstresses with a Weibull fitting-distribution. The method simplifies the former IEC method. It also gives benefit by allowing a modification on the duration and the number of samples based on the reliability target and the confidence level. With this approach, the length of the test reduces to about 20% in comparison to a full test recommended by the IEC.","PeriodicalId":250648,"journal":{"name":"2019 Asia Pacific Conference on Research in Industrial and Systems Engineering (APCoRISE)","volume":"40 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-04-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 Asia Pacific Conference on Research in Industrial and Systems Engineering (APCoRISE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/APCoRISE46197.2019.9318789","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

An energy meter should continuously provide a good-accuracy as any deviation contributes to the company (or customer) loss. One approach to estimate the reliability of the meter is through the accelerated reliability testing. During the test, samples are tested inside a climatic-chamber with humidity and temperature above the operating conditions. The known testing procedures based on the IEC 62059-31-1:2008, however, is time-consuming. Some reasons are due to the daily-interval checking for all samples and the combination number of over-stresses in the test. For these reasons, the PLN proposed an alternative method by which it employs only the maximum temperature and humidity overstresses with a Weibull fitting-distribution. The method simplifies the former IEC method. It also gives benefit by allowing a modification on the duration and the number of samples based on the reliability target and the confidence level. With this approach, the length of the test reduces to about 20% in comparison to a full test recommended by the IEC.
印尼PLN电能表可靠性加速试验的替代方法
电能表应持续提供良好的精度,因为任何偏差都会导致公司(或客户)损失。一种评估仪表可靠性的方法是通过加速可靠性试验。在测试过程中,样品在湿度和温度高于操作条件的气候室中进行测试。然而,基于IEC 62059-31-1:2008的已知测试程序非常耗时。一些原因是由于所有样品的每日间隔检查和试验中过度应力的组合次数。由于这些原因,PLN提出了一种替代方法,该方法仅使用威布尔拟合分布的最高温度和湿度超应力。该方法对原有的IEC方法进行了简化。它还允许基于可靠性目标和置信水平对持续时间和样本数量进行修改,从而带来好处。采用这种方法,与IEC推荐的完整测试相比,测试的长度减少了约20%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信