New OCTG Developments to Overcome Challenges in Unconventional Plays

Carlos Blanc, Joshua Lewis, A. Ichim, David Mutis, Alexandru Zestran, Carlos Ignaccio Lucca, Leandro Perelló
{"title":"New OCTG Developments to Overcome Challenges in Unconventional Plays","authors":"Carlos Blanc, Joshua Lewis, A. Ichim, David Mutis, Alexandru Zestran, Carlos Ignaccio Lucca, Leandro Perelló","doi":"10.2118/196596-ms","DOIUrl":null,"url":null,"abstract":"\n Research and development drives success in shale plays throughout the world, enabling operators to deploy new drilling, completions, and production technologies to reach more reservoir area and extend the life of production wells. This work demonstrates the development, validation, and deployment of an extreme torque casing connection addressing technical challenges of tubulars in unconventionals.\n Throughout the well lifetime, Oil Country Tubular Goods (OCTG) experience various loads during the installation, stimulation, and production phases. Some of the challenges experienced during the stimulation and production phases relate to internal and external pressure resistance, sealability, corrosion and cracking, erosion, and wear. Furthermore, with the increase in lateral length and the more demanding well geometries, the OCTG capabilities related to high cycle fatigue, connection runability, and torque limits become more important to safely and efficiently reach the total depth of the well and ensure integrity throughout well life. Another scenario in which the torque limit of an OCTG connection is important is rotating while cementing, a practice undertaken to mitigate sustained casing pressure, improve well integrity, and completion efficiency.\n We present the key elements in the development of a casing connection that overcomes these challenges and the decision process leading to a prototype. To prove the design concept, a fit-for-purpose testing protocol was adopted to validate its performance, replicating the installation, stimulation, and production phases under the expected loads. Once validated, a pilot involving casing installation, rotation while cementing and stimulation was completed in two wells, and its outcomes will be discussed in this work.\n This novel casing extreme torque connection, designed to overcome the application challenges, enables the installation of casing in longer laterals, together with the improvement of well integrity through rotation while cementing.\n The performance of the product, tested through a special procedure while ensuring reliability, was confirmed by the case study from the Niobrara shale. A new connection considering the challenges of wells in unconventional plays must account for several aspects from design to installation. We show the process, from the design stage and validation, leading to successful field deployment.","PeriodicalId":197372,"journal":{"name":"Day 2 Wed, October 16, 2019","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-10-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Wed, October 16, 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/196596-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

Research and development drives success in shale plays throughout the world, enabling operators to deploy new drilling, completions, and production technologies to reach more reservoir area and extend the life of production wells. This work demonstrates the development, validation, and deployment of an extreme torque casing connection addressing technical challenges of tubulars in unconventionals. Throughout the well lifetime, Oil Country Tubular Goods (OCTG) experience various loads during the installation, stimulation, and production phases. Some of the challenges experienced during the stimulation and production phases relate to internal and external pressure resistance, sealability, corrosion and cracking, erosion, and wear. Furthermore, with the increase in lateral length and the more demanding well geometries, the OCTG capabilities related to high cycle fatigue, connection runability, and torque limits become more important to safely and efficiently reach the total depth of the well and ensure integrity throughout well life. Another scenario in which the torque limit of an OCTG connection is important is rotating while cementing, a practice undertaken to mitigate sustained casing pressure, improve well integrity, and completion efficiency. We present the key elements in the development of a casing connection that overcomes these challenges and the decision process leading to a prototype. To prove the design concept, a fit-for-purpose testing protocol was adopted to validate its performance, replicating the installation, stimulation, and production phases under the expected loads. Once validated, a pilot involving casing installation, rotation while cementing and stimulation was completed in two wells, and its outcomes will be discussed in this work. This novel casing extreme torque connection, designed to overcome the application challenges, enables the installation of casing in longer laterals, together with the improvement of well integrity through rotation while cementing. The performance of the product, tested through a special procedure while ensuring reliability, was confirmed by the case study from the Niobrara shale. A new connection considering the challenges of wells in unconventional plays must account for several aspects from design to installation. We show the process, from the design stage and validation, leading to successful field deployment.
OCTG新发展克服非常规油藏挑战
研究和开发推动了全球页岩油气的成功,使作业者能够部署新的钻井、完井和生产技术,以达到更大的储层面积,延长生产井的寿命。这项工作展示了一种极扭矩套管连接的开发、验证和应用,解决了非常规油气中管柱的技术挑战。在油井的整个生命周期中,Oil Country tube Goods (OCTG)在安装、增产和生产阶段都会经历各种负载。增产和生产阶段面临的一些挑战涉及内外耐压性、密封性、腐蚀和开裂、侵蚀和磨损。此外,随着水平段长度的增加和对井几何形状的要求越来越高,与高循环疲劳、连接可操作性和扭矩限制相关的OCTG能力对于安全有效地达到井的总深度和确保井的整个生命周期的完整性变得更加重要。OCTG接头扭矩限制的另一种重要应用是在固井时旋转,这种做法可以降低持续的套管压力,提高井的完整性和完井效率。我们介绍了套管连接开发过程中克服这些挑战的关键因素,以及开发原型的决策过程。为了验证设计理念,采用了一种适合目的的测试方案来验证其性能,在预期负载下复制安装、增产和生产阶段。验证后,在两口井中完成了套管安装、固井时旋转和增产的试验,其结果将在本工作中讨论。这种新型的套管极扭矩连接旨在克服应用挑战,能够在更长的水平段安装套管,并通过固井时的旋转提高井的完整性。在Niobrara页岩的案例研究中,通过特殊程序测试了该产品的性能,同时确保了可靠性。考虑到非常规油气藏的挑战,一个新的接箍必须考虑从设计到安装的几个方面。我们展示了从设计阶段到验证阶段的整个过程,从而成功地实现了现场部署。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书