PARAMETERS OF UNCERTAINTY AMONG QUANTITY SURVEYORS FOR HERITAGE CONSERVATION REFURBISHMENT PROJECTS: THE CASE STUDY APPROACH

F. Ismail, Nurul Afida Isnaini Janipha, I. Jabar, Farah Nasiha Suhaili
{"title":"PARAMETERS OF UNCERTAINTY AMONG QUANTITY SURVEYORS FOR HERITAGE CONSERVATION REFURBISHMENT PROJECTS: THE CASE STUDY APPROACH","authors":"F. Ismail, Nurul Afida Isnaini Janipha, I. Jabar, Farah Nasiha Suhaili","doi":"10.22452/JSCP.VOL9NO1.5","DOIUrl":null,"url":null,"abstract":"Previous studies revealed that heritage conservation refurbishment projects contain more technical and economic uncertainty than new builds projects. Without a proper investigation by an experienced specialist, these uncertainties will remain unknown until the refurbishment works are carried out. Hence, it is insufficient for the Quantity Surveying (QS) to prepare tender documents for conservation work merely using standard documents for new building works. The objectives of this paper are to determine parameters of uncertainty that influence QS's services and to analyze the mitigation approaches in managing these uncertainties. Three projects were chosen as the Case Study in which the data was collected through questionnaire surveys distributed to five main stakeholders of the project. After the questionnaire distributed among the main consultants of the project, the same set of parameters of uncertainty were then verified with QS on which of those eleven (11) parameters of uncertainty that influence the QS's service. Case study analysis and content analysis are used in the data analysis. The results conclude that out of eleven (11) parameters of uncertainty; only three influenced QSS service in this project: availability of information; availability of material; and sufficiency of time allocation during the investigation phase. This study is intended to shed light for the QS to get an insight on heritage conservation refurbishment works as a whole and understand the main characteristic of the project which is complexity and uncertainty.","PeriodicalId":311104,"journal":{"name":"Journal of Surveying, Construction & Property","volume":"55 5 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-06-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Surveying, Construction & Property","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.22452/JSCP.VOL9NO1.5","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Previous studies revealed that heritage conservation refurbishment projects contain more technical and economic uncertainty than new builds projects. Without a proper investigation by an experienced specialist, these uncertainties will remain unknown until the refurbishment works are carried out. Hence, it is insufficient for the Quantity Surveying (QS) to prepare tender documents for conservation work merely using standard documents for new building works. The objectives of this paper are to determine parameters of uncertainty that influence QS's services and to analyze the mitigation approaches in managing these uncertainties. Three projects were chosen as the Case Study in which the data was collected through questionnaire surveys distributed to five main stakeholders of the project. After the questionnaire distributed among the main consultants of the project, the same set of parameters of uncertainty were then verified with QS on which of those eleven (11) parameters of uncertainty that influence the QS's service. Case study analysis and content analysis are used in the data analysis. The results conclude that out of eleven (11) parameters of uncertainty; only three influenced QSS service in this project: availability of information; availability of material; and sufficiency of time allocation during the investigation phase. This study is intended to shed light for the QS to get an insight on heritage conservation refurbishment works as a whole and understand the main characteristic of the project which is complexity and uncertainty.
文物保护翻新工程中工料测量师的不确定性参数:个案研究方法
先前的研究表明,文物保护翻新项目比新建项目包含更多的技术和经济不确定性。如果没有经验丰富的专家进行适当的调查,这些不确定性将一直保持未知,直到翻新工程进行。因此,工料测量师仅使用新建筑工程的标准文件来拟备保育工程的标书是不够的。本文的目的是确定影响QS服务的不确定性参数,并分析管理这些不确定性的缓解方法。选择三个项目作为案例研究,其中通过问卷调查收集数据,分发给项目的五个主要利益相关者。问卷分发给项目的主要顾问后,再用QS对同一组不确定参数进行验证,这十一(11)个不确定参数中哪一个影响QS的服务。在数据分析中采用了案例分析和内容分析。结果表明,十一(11)个参数的不确定度;在这个项目中只有三个影响QSS服务:信息的可用性;材料的可得性;调查阶段的时间分配是否充足。本研究旨在帮助QS了解文物保育翻新工程的整体情况,并了解该项目的主要特点,即复杂性和不确定性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书