PERENCANAAN MANAJEMEN PROYEK DALAM PERAWATAN APU GTCP131-9B PT. GARUDA INDONESIA

Dicky Gumilang, Dennis Timothy
{"title":"PERENCANAAN MANAJEMEN PROYEK DALAM PERAWATAN APU GTCP131-9B PT. GARUDA INDONESIA","authors":"Dicky Gumilang, Dennis Timothy","doi":"10.34010/iqe.v10i2.7308","DOIUrl":null,"url":null,"abstract":"The air transportation industry in Indonesia is growing rapidly and is very competitive. Aircraft fleet maintenance is an important factor in supporting airlines to compete in the local and global industry. On the other hand, delays in the completion of fleet maintenance can result in delays in flight schedules and this is very detrimental to the airline and passengers. This is a challenge for business actors in the aircraft maintenance sector because of the risk of being penalized for delays that occur. Therefore, this study aims to reduce the risk of late fines faced by aircraft maintenance business actors. With project management, the company is expected to be able to produce effective and efficient maintenance activities. This is very much needed by the company in producing optimal output and has a great impact on airlines that use aircraft maintenance services. In this study, the evaluation of project management uses the Critical Path Method (CPM), Program Evaluation and Review Technique (PERT), Work Breakdown Structure (WBS) to evaluate the preparation of aircraft maintenance activities and the Crashing method if acceleration is needed in completing maintenance activities in accordance with agreed agreement. With the preparation of good project management, it is possible to estimate the time and cost needed to complete a project so as to minimize delays and losses in completion. The project management planning used in this project resulted in an accelerated completion of 3.5 days with an additional cost of $ 8,958.23.","PeriodicalId":250764,"journal":{"name":"Inaque : Journal of Industrial and Quality Engineering","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-12-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Inaque : Journal of Industrial and Quality Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.34010/iqe.v10i2.7308","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The air transportation industry in Indonesia is growing rapidly and is very competitive. Aircraft fleet maintenance is an important factor in supporting airlines to compete in the local and global industry. On the other hand, delays in the completion of fleet maintenance can result in delays in flight schedules and this is very detrimental to the airline and passengers. This is a challenge for business actors in the aircraft maintenance sector because of the risk of being penalized for delays that occur. Therefore, this study aims to reduce the risk of late fines faced by aircraft maintenance business actors. With project management, the company is expected to be able to produce effective and efficient maintenance activities. This is very much needed by the company in producing optimal output and has a great impact on airlines that use aircraft maintenance services. In this study, the evaluation of project management uses the Critical Path Method (CPM), Program Evaluation and Review Technique (PERT), Work Breakdown Structure (WBS) to evaluate the preparation of aircraft maintenance activities and the Crashing method if acceleration is needed in completing maintenance activities in accordance with agreed agreement. With the preparation of good project management, it is possible to estimate the time and cost needed to complete a project so as to minimize delays and losses in completion. The project management planning used in this project resulted in an accelerated completion of 3.5 days with an additional cost of $ 8,958.23.
印尼揭路荼维修APU GTCP131-9B项目管理规划
印尼的航空运输业发展迅速,竞争激烈。机队维护是支持航空公司在本地和全球航空业竞争的一个重要因素。另一方面,机队维修工作的延误会导致航班延误,这对航空公司和乘客都是非常不利的。这对飞机维修行业的商业行为者来说是一个挑战,因为发生延误可能会受到惩罚。因此,本研究旨在降低飞机维修业务参与者所面临的逾期罚款风险。通过项目管理,公司被期望能够产生有效和高效的维护活动。这是公司生产最优产出所需要的,对使用飞机维修服务的航空公司有很大的影响。本研究采用关键路径法(CPM)、计划评估与评审技术(PERT)、工作分解结构(WBS)对飞机维修活动的准备工作进行评估,如果按照约定的协议完成维修活动需要加速,则采用crash法对项目管理进行评估。有了良好的项目管理准备,就可以估计完成一个项目所需的时间和成本,从而最大限度地减少完工的延误和损失。本项目采用的项目管理规划使项目提前3.5天完成,额外费用为8 958.23美元。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信