Recycling of tunnel excavation using the example of the Koralm Tunnel, contract KAT2 – Status April 2015 / Verwertung von Tunnelausbruch am Beispiel des Koralmtunnels, Baulos KAT2 – Stand April 2015

Helmut Posch, R. Otto, H. Huber, R. Murr, Matthias Kager, H. Wagner
{"title":"Recycling of tunnel excavation using the example of the Koralm Tunnel, contract KAT2 – Status April 2015 / Verwertung von Tunnelausbruch am Beispiel des Koralmtunnels, Baulos KAT2 – Stand April 2015","authors":"Helmut Posch, R. Otto, H. Huber, R. Murr, Matthias Kager, H. Wagner","doi":"10.1002/geot.201500013","DOIUrl":null,"url":null,"abstract":"Contract KAT2 will produce about 8.6 m. t of material excavated from the tunnel. In the course of the design work, maximum reuse of this material was intended, always considering economics and while reducing the environmental impact by minimizing transport and saving resources. More than half of the suitable tunnel spoil will be preliminarily screened and then processed for the production of aggregates for concrete production. After the first year of production, the high losses associated with the preliminary screening and processing demanded measures to improve the processing, which led to an improvement of the recycling quota. The aggregates produced on site so far fulfil the technical requirements for concrete production, even for high strength concrete grades.","PeriodicalId":170042,"journal":{"name":"Geomechanics and Tunnelling","volume":"8 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Geomechanics and Tunnelling","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1002/geot.201500013","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

Contract KAT2 will produce about 8.6 m. t of material excavated from the tunnel. In the course of the design work, maximum reuse of this material was intended, always considering economics and while reducing the environmental impact by minimizing transport and saving resources. More than half of the suitable tunnel spoil will be preliminarily screened and then processed for the production of aggregates for concrete production. After the first year of production, the high losses associated with the preliminary screening and processing demanded measures to improve the processing, which led to an improvement of the recycling quota. The aggregates produced on site so far fulfil the technical requirements for concrete production, even for high strength concrete grades.
以Koralm隧道为例,隧道开挖的回收利用,合同KAT2 - 2015年4月/ Verwertung von Tunnelausbruch am Beispiel des Koralmtunnels, Baulos KAT2 - 2015年4月
合同KAT2将从隧道中挖掘出约8.6公吨的材料。在设计过程中,最大限度地利用这种材料,始终考虑到经济效益,同时通过减少运输和节约资源来减少对环境的影响。超过一半的合适的隧道废土将被初步筛选,然后加工成生产混凝土的骨料。在生产的第一年之后,与初步筛选和加工相关的高损耗要求采取措施改进加工,这导致了回收配额的提高。到目前为止,现场生产的骨料满足混凝土生产的技术要求,即使是高强度混凝土等级。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信