Kajian Landing Station Alat Deteksi Dini Tsunami Berbasis Kabel Serat Optik Bawah Laut di Kabupaten Pasangkayu, Sulawesi Barat

Puspa Khaerani, Heru Sri Naryanto, Dian Nuraini Melati, Syakira Trisnafiah
{"title":"Kajian Landing Station Alat Deteksi Dini Tsunami Berbasis Kabel Serat Optik Bawah Laut di Kabupaten Pasangkayu, Sulawesi Barat","authors":"Puspa Khaerani, Heru Sri Naryanto, Dian Nuraini Melati, Syakira Trisnafiah","doi":"10.29122/alami.v5i1.4841","DOIUrl":null,"url":null,"abstract":"The construction of an underwater fiber-optic cable-based tsunami early detection system is planned to be installed in the Makassar Strait with a landing point in West Sulawesi. Land infrastructure such as a Power House (PH), a communication tower, and a Beach Manhole (BMH) is needed to sustain the system's power in order to survive. Therefore, the aim of this scientific paper is to study several alternative landing station locations in Pasangkayu, West Sulawesi and then determine the priority locations. The methods used to achieve these objectives are field observation methods and secondary data analysis based on parameters of land area conditions, environmental conditions, supporting infrastructure, social conditions and licensing systems, and marine activities. These aspects are then assessed to determine the priority of the selected location. The location selected based on the assessment carried out is ALT-02B. In succession, the three priority locations selected from the order of most priority to least priority are ALT-02B, ALT-02A, and ALT-06. This selected priority location is not necessarily the final choice location to be used in the construction of a tsunami early detection system land infrastructure because in the process there are still things to be considered and aspects that are made the main priority for consideration in making decisions.","PeriodicalId":270402,"journal":{"name":"Jurnal Alami : Jurnal Teknologi Reduksi Risiko Bencana","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-07-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Alami : Jurnal Teknologi Reduksi Risiko Bencana","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29122/alami.v5i1.4841","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The construction of an underwater fiber-optic cable-based tsunami early detection system is planned to be installed in the Makassar Strait with a landing point in West Sulawesi. Land infrastructure such as a Power House (PH), a communication tower, and a Beach Manhole (BMH) is needed to sustain the system's power in order to survive. Therefore, the aim of this scientific paper is to study several alternative landing station locations in Pasangkayu, West Sulawesi and then determine the priority locations. The methods used to achieve these objectives are field observation methods and secondary data analysis based on parameters of land area conditions, environmental conditions, supporting infrastructure, social conditions and licensing systems, and marine activities. These aspects are then assessed to determine the priority of the selected location. The location selected based on the assessment carried out is ALT-02B. In succession, the three priority locations selected from the order of most priority to least priority are ALT-02B, ALT-02A, and ALT-06. This selected priority location is not necessarily the final choice location to be used in the construction of a tsunami early detection system land infrastructure because in the process there are still things to be considered and aspects that are made the main priority for consideration in making decisions.
一个基于水下光纤电缆的海啸早期探测系统计划安装在望加锡海峡,着陆点在西苏拉威西。为了维持系统的电力,需要陆地基础设施,如发电厂(PH)、通信塔和海滩沙井(BMH)。因此,这篇科学论文的目的是研究西苏拉威西Pasangkayu的几个替代登陆站位置,然后确定优先位置。为实现这些目标所使用的方法是实地观测方法和基于陆地面积条件、环境条件、支助基础设施、社会条件和许可制度以及海洋活动等参数的二次数据分析。然后对这些方面进行评估,以确定选定地点的优先级。根据所进行的评估选择的地点为ALT-02B。按优先级由高到低依次选择三个优先位置为ALT-02B、ALT-02A、ALT-06。这个选择的优先位置不一定是海啸早期探测系统陆地基础设施建设的最终选择位置,因为在这个过程中仍然有一些事情和方面需要考虑,这些事情和方面在决策时被视为主要的优先考虑因素。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信