Substation replacement options and considerations

Frank E. Bresnan, E. Jonson, Tyler Somes
{"title":"Substation replacement options and considerations","authors":"Frank E. Bresnan, E. Jonson, Tyler Somes","doi":"10.1109/PCICON.2014.6961877","DOIUrl":null,"url":null,"abstract":"There are many things to consider when evaluating the replacement of a distribution substation. Establishing the electrical configuration, process considerations, equipment sizes and ratings, what options to include, and their relative initial cost, are all part of defining and establishing the best design for a project. The loss or interruption of electrical power during operating periods is not an acceptable option at most refining facilities. This creates difficulty conducting electrical maintenance and tie-ins. Aspects such as safety, capacity, expandability, and cost must also be considered to ensure that the installed design offers real long-term benefit and value to the organization. While the absolute minimum on equipment sizes and ratings can always be determined, it is finding the best balance between pre-investment and costs that offers the most value. This paper will describe some of the options and considerations that were evaluated at the distribution substation level for a large petroleum refinery, and how those decisions led to a degree of standardization for the electrical configuration.","PeriodicalId":264800,"journal":{"name":"2014 IEEE Petroleum and Chemical Industry Technical Conference (PCIC)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2014-11-20","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 IEEE Petroleum and Chemical Industry Technical Conference (PCIC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PCICON.2014.6961877","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

There are many things to consider when evaluating the replacement of a distribution substation. Establishing the electrical configuration, process considerations, equipment sizes and ratings, what options to include, and their relative initial cost, are all part of defining and establishing the best design for a project. The loss or interruption of electrical power during operating periods is not an acceptable option at most refining facilities. This creates difficulty conducting electrical maintenance and tie-ins. Aspects such as safety, capacity, expandability, and cost must also be considered to ensure that the installed design offers real long-term benefit and value to the organization. While the absolute minimum on equipment sizes and ratings can always be determined, it is finding the best balance between pre-investment and costs that offers the most value. This paper will describe some of the options and considerations that were evaluated at the distribution substation level for a large petroleum refinery, and how those decisions led to a degree of standardization for the electrical configuration.
变电站更换方案及注意事项
在评估配电变电站的更换时,有许多事情需要考虑。确定电气配置、工艺考虑、设备尺寸和额定值、包括哪些选项以及它们的相对初始成本,都是定义和建立项目最佳设计的一部分。在大多数炼油设施,在运行期间电力的损失或中断是不可接受的选择。这就造成了进行电气维护和连接的困难。还必须考虑安全性、容量、可扩展性和成本等方面,以确保安装的设计为组织提供真正的长期利益和价值。虽然设备尺寸和额定值的绝对最小值总是可以确定的,但它正在寻找投资前和成本之间的最佳平衡,从而提供最大的价值。本文将描述在大型炼油厂配电变电站级别评估的一些选择和考虑因素,以及这些决定如何导致电气配置的标准化程度。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信