A Practical Approach to Maximise UGS Storage Efficiency in Order to Secure Energy Supply

Limin Li, Huijuan Yu, A. Kshirsagar, Ayman Samy, Chuanqin Mao, Lin Qu, Agung Kuswiranto, F. Gui, D. Cook
{"title":"A Practical Approach to Maximise UGS Storage Efficiency in Order to Secure Energy Supply","authors":"Limin Li, Huijuan Yu, A. Kshirsagar, Ayman Samy, Chuanqin Mao, Lin Qu, Agung Kuswiranto, F. Gui, D. Cook","doi":"10.2118/209658-ms","DOIUrl":null,"url":null,"abstract":"\n The Underground Gas Storage (UGS) working gas capacity is one of the important design parameters for a UGS project. The objective of this paper is to demonstrate a case study from Sichuan area, China, where a fractured carbonate gas reservoir was used for UGS and show the key factors that should be considered to optimize UGS working gas capacity and help to secure energy supply during peak season.\n The dynamic simulation model was history matched on both depletion and storage. This model was coupled with 4D Geomechanics effects. It was then employed to capture the key parameters that will affect the working gas capacity. Based on the 4D Geomechanical integrity and facility assessment results, the forecast model was created using the subsurface and surface facility constraints. The study workflow included setting up the forecast model, uncertainty analysis and sensitivity analysis to capture the key driving parameters for the working gas volume. This study also included sensitivities of emergency gas supply during peak winter season.\n This study showed that the main factors that determine the UGS working gas capacity are the initial gas in place, tubing head pressure (THP) during withdrawal phase, bottom hole pressure (BHP) during injection phase, well pattern and well count. It was observed that each injection/production cycle is affected by the previous cycles. The simulation showed that the incremental working gas volume represented as a trend can be better fitted by a power function with both THP and BHP. It also demonstrated that lowering the THP limitation is more effective than increasing the BHP limitation. However, this may require surface facility upgrading. The optimum operating condition was identified by considering all engineering and geomechanical constrains such as erosion, wellbore integrity and cap rock integrity. This is used to guide the UGS daily operations with optimum production/injection rate of each well in a safe manner. The study recommended to implement a stepwise strategy to reach the working gas capacity.\n This paper presents a novel practical workflow and methodology to implement increased UGS reservoir working capacity. It also provides a practical way to forecast the operational pressure range and quickly predict the deliverability of emergency gas supply under various market demands.","PeriodicalId":311361,"journal":{"name":"Day 3 Wed, June 08, 2022","volume":"161 7 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-06-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 3 Wed, June 08, 2022","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/209658-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The Underground Gas Storage (UGS) working gas capacity is one of the important design parameters for a UGS project. The objective of this paper is to demonstrate a case study from Sichuan area, China, where a fractured carbonate gas reservoir was used for UGS and show the key factors that should be considered to optimize UGS working gas capacity and help to secure energy supply during peak season. The dynamic simulation model was history matched on both depletion and storage. This model was coupled with 4D Geomechanics effects. It was then employed to capture the key parameters that will affect the working gas capacity. Based on the 4D Geomechanical integrity and facility assessment results, the forecast model was created using the subsurface and surface facility constraints. The study workflow included setting up the forecast model, uncertainty analysis and sensitivity analysis to capture the key driving parameters for the working gas volume. This study also included sensitivities of emergency gas supply during peak winter season. This study showed that the main factors that determine the UGS working gas capacity are the initial gas in place, tubing head pressure (THP) during withdrawal phase, bottom hole pressure (BHP) during injection phase, well pattern and well count. It was observed that each injection/production cycle is affected by the previous cycles. The simulation showed that the incremental working gas volume represented as a trend can be better fitted by a power function with both THP and BHP. It also demonstrated that lowering the THP limitation is more effective than increasing the BHP limitation. However, this may require surface facility upgrading. The optimum operating condition was identified by considering all engineering and geomechanical constrains such as erosion, wellbore integrity and cap rock integrity. This is used to guide the UGS daily operations with optimum production/injection rate of each well in a safe manner. The study recommended to implement a stepwise strategy to reach the working gas capacity. This paper presents a novel practical workflow and methodology to implement increased UGS reservoir working capacity. It also provides a practical way to forecast the operational pressure range and quickly predict the deliverability of emergency gas supply under various market demands.
一个实用的方法,以最大限度地提高UGS储存效率,以确保能源供应
地下储气库工作气量是地下储气库工程设计的重要参数之一。本文的目的是通过对中国四川地区一个裂缝性碳酸盐岩气藏进行UGS的案例研究,展示优化UGS工作气量、确保旺季能源供应应考虑的关键因素。动态模拟模型在耗竭和储存量上都进行了历史匹配。该模型与四维地质力学效应耦合。然后利用它来获取影响工作气量的关键参数。基于四维地质力学完整性和设施评估结果,利用地下和地表设施约束条件建立了预测模型。研究流程包括建立预测模型、不确定性分析和敏感性分析,以获取工作气量的关键驱动参数。本研究还纳入了冬季高峰时段应急供气的敏感性。研究表明,决定UGS工作气量的主要因素是初始气量、抽采阶段油管头压力(THP)、注入阶段井底压力(BHP)、井网和井数。观察到,每个注射/生产周期都受到前一个周期的影响。模拟结果表明,用THP和BHP的幂函数可以较好地拟合以趋势形式表示的工作气量增量。结果表明,降低THP限值比提高BHP限值更有效。然而,这可能需要对地面设施进行升级。考虑了侵蚀、井筒完整性和盖层完整性等所有工程和地质力学约束条件,确定了最佳作业条件。用于指导UGS的日常作业,以安全的方式实现每口井的最佳生产/注入速度。研究建议采取循序渐进的策略,以达到工作气量。本文提出了一种新的实用工作流程和方法,以实现UGS油藏工作能力的提高。为预测运行压力范围,快速预测各种市场需求下应急供气能力提供了一种实用的方法。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书