Estimating Uncertainty of a Measurement Process

N. Chang, Jim Lambert
{"title":"Estimating Uncertainty of a Measurement Process","authors":"N. Chang, Jim Lambert","doi":"10.1109/CIMSA.2007.4362529","DOIUrl":null,"url":null,"abstract":"Estimating a measurement of software quality is a challenge where uncertainty and variation have the greatest impact. Especially, at times when there is not enough information. Here, EUMP (estimating uncertainty of a measurement process) is introduced. EUMP is a recursive process which is using both multi regression and Monte Carlo simulation. It can be systematically obtained through EUMP for all distribution functions of both dependent and independent variables. Moreover, dependent variable can be estimated. Finally, a predictable system will be described, where the error of an estimated dependent variable will be proven it goes to zero when time (t) goes to infinity.","PeriodicalId":392846,"journal":{"name":"2007 IEEE International Conference on Computational Intelligence for Measurement Systems and Applications","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-06-27","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2007 IEEE International Conference on Computational Intelligence for Measurement Systems and Applications","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CIMSA.2007.4362529","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Estimating a measurement of software quality is a challenge where uncertainty and variation have the greatest impact. Especially, at times when there is not enough information. Here, EUMP (estimating uncertainty of a measurement process) is introduced. EUMP is a recursive process which is using both multi regression and Monte Carlo simulation. It can be systematically obtained through EUMP for all distribution functions of both dependent and independent variables. Moreover, dependent variable can be estimated. Finally, a predictable system will be described, where the error of an estimated dependent variable will be proven it goes to zero when time (t) goes to infinity.
测量过程的不确定度估计
评估软件质量的度量是一个挑战,其中不确定性和变化具有最大的影响。特别是在没有足够信息的时候。这里介绍了测量过程的不确定度估计(EUMP)。EUMP是一个采用多元回归和蒙特卡罗模拟的递归过程。对于所有因变量和自变量的分布函数,都可以通过EUMP系统地求得。此外,因变量可以估计。最后,将描述一个可预测的系统,其中估计的因变量的误差将被证明,当时间(t)趋于无穷时,它趋于零。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书