Critical Success Factors for the Implementation of Building Information Modeling (BIM) among Construction Industry Development Board (CIDB) G7 Contractors in the Klang Valley, Malaysia

K. Muthusamy, Leopold Chew
{"title":"Critical Success Factors for the Implementation of Building Information Modeling (BIM) among Construction Industry Development Board (CIDB) G7 Contractors in the Klang Valley, Malaysia","authors":"K. Muthusamy, Leopold Chew","doi":"10.1109/E-TEMS46250.2020.9111716","DOIUrl":null,"url":null,"abstract":"The benefits of BIM had been established and published by many works of literature, especially on its benefits to the Architectural, Engineering and Construction (AEC) industry. The adoption of BIM reduces projects cost, time and increases the quality of work from the context of project management towards achieving smart cities. BIM is a process rather than a product, and it has the abilities to make a city \"smart\". Despite its advantages, its application in Malaysia is limited, especially among contractors. The objectives of this study are 1) To determine the prevalence of BIM usage among CIDB G7 contractors in the Klang Valley 2) To identify the factors affecting the adoption of BIM among CIDB G7 contractors in the Klang Valley and 3) To analyze and rank factors affecting the adoption of BIM among CIDB G7 contractors in the Klang Valley. Extensive literature survey identified the factors that affect the adoption of BIM. From the factors, Likert scale questionnaires were developed and sent to targeted respondents to obtain their feedback. Feedbacks obtained indicated that a high prevalence of BIM usage at 71%. Relative Importance Index (RII) was used to rank the factors affecting the adoption of BIM. The factors in decreasing order are 1) Tax, 2) Government support, 3) Cost, 4) Research collaboration, 5) Impact on business process, 6) BIM standard, 7) Training, 8) Organizational leadership, 9) Organizational culture, 10) Time impact, 11) Data sharing protocol and 12) Interoperability.","PeriodicalId":345917,"journal":{"name":"2020 IEEE European Technology and Engineering Management Summit (E-TEMS)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-03-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 IEEE European Technology and Engineering Management Summit (E-TEMS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/E-TEMS46250.2020.9111716","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

The benefits of BIM had been established and published by many works of literature, especially on its benefits to the Architectural, Engineering and Construction (AEC) industry. The adoption of BIM reduces projects cost, time and increases the quality of work from the context of project management towards achieving smart cities. BIM is a process rather than a product, and it has the abilities to make a city "smart". Despite its advantages, its application in Malaysia is limited, especially among contractors. The objectives of this study are 1) To determine the prevalence of BIM usage among CIDB G7 contractors in the Klang Valley 2) To identify the factors affecting the adoption of BIM among CIDB G7 contractors in the Klang Valley and 3) To analyze and rank factors affecting the adoption of BIM among CIDB G7 contractors in the Klang Valley. Extensive literature survey identified the factors that affect the adoption of BIM. From the factors, Likert scale questionnaires were developed and sent to targeted respondents to obtain their feedback. Feedbacks obtained indicated that a high prevalence of BIM usage at 71%. Relative Importance Index (RII) was used to rank the factors affecting the adoption of BIM. The factors in decreasing order are 1) Tax, 2) Government support, 3) Cost, 4) Research collaboration, 5) Impact on business process, 6) BIM standard, 7) Training, 8) Organizational leadership, 9) Organizational culture, 10) Time impact, 11) Data sharing protocol and 12) Interoperability.
马来西亚巴生谷建筑业发展委员会(CIDB) G7承包商实施建筑信息模型(BIM)的关键成功因素
BIM的好处已经被许多文献所确立和发表,特别是它对建筑、工程和施工(AEC)行业的好处。BIM的采用降低了项目成本、时间,并从项目管理的背景下提高了工作质量,实现了智慧城市。BIM是一个过程,而不是一个产品,它有能力让城市变得“聪明”。尽管有这些优势,但它在马来西亚的应用有限,尤其是在承包商中。本研究的目的是:1)确定BIM在巴生谷CIDB G7承包商中的使用情况;2)确定影响巴生谷CIDB G7承包商采用BIM的因素;3)分析影响巴生谷CIDB G7承包商采用BIM的因素并对其进行排名。广泛的文献调查确定了影响BIM采用的因素。从这些因素出发,制定李克特量表问卷,发给目标被调查者,获取他们的反馈。获得的反馈表明,BIM的使用率高达71%。采用相对重要性指数(Relative Importance Index, RII)对影响BIM采用的因素进行排序。按降序排列的因素是:1)税收,2)政府支持,3)成本,4)研究合作,5)对业务流程的影响,6)BIM标准,7)培训,8)组织领导,9)组织文化,10)时间影响,11)数据共享协议和12)互操作性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信