{"title":"DESAIN CHANGES IN A SHORT DURATION CONSTRUCTION PROJECT WITH COST AND TIME BOUNDARIES: A PROJECT REVIEW","authors":"Rachmad Irwanto","doi":"10.24853/ijcei.2.2.19-27","DOIUrl":null,"url":null,"abstract":"Design changes are inevitable in most projects. In many construction projects they may look not too complicated to be executed in front of computer models. The actual situation turned out to be the other way around. Apart from detailed changes in shop drawings, bill of quantity and specifications, administrative works related to the project are quite considerations. These mounted consequences would be more for short duration projects with government funding executed in the near end book period. The allocated execution period for short duration projects is not usually allowing rapid changes for the unexpected consequences. This paper presents what actually happens inside the project management during the contract change order process.","PeriodicalId":389729,"journal":{"name":"International Journal of Civil Engineering and Infrastructure","volume":"25 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-01-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Civil Engineering and Infrastructure","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24853/ijcei.2.2.19-27","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Design changes are inevitable in most projects. In many construction projects they may look not too complicated to be executed in front of computer models. The actual situation turned out to be the other way around. Apart from detailed changes in shop drawings, bill of quantity and specifications, administrative works related to the project are quite considerations. These mounted consequences would be more for short duration projects with government funding executed in the near end book period. The allocated execution period for short duration projects is not usually allowing rapid changes for the unexpected consequences. This paper presents what actually happens inside the project management during the contract change order process.