{"title":"Analysis of a flashover operation on two 138kV transmission lines","authors":"M. McMillan, Stephen Copeland, Joe Perez, Hung-Ming Chou","doi":"10.1109/CPRE.2014.6799014","DOIUrl":null,"url":null,"abstract":"Flashover operations due to a change in the physical positioning of a foreign object with an energized conductor are a common occurrence seen throughout many transmission and distribution systems. The inception of a fault from a flashover between two stationary conductors, however, is not as prevalent. This is primarily due to extensive protection system coordination and insulation design specifications that, under anticipated fault conditions, will allow the necessary protection devices to operate, thereby clearing the fault. For Bryan Texas Utilities during the summer of 2013, a particular flashover operation brought about a series of atypical events, which resulted in several operations involving two 138kV transmission lines as well as portions of the 12.5kV distribution system. As presented in the following analysis, it is evident that, while the fault conditions experienced by the system were not within anticipated limits, there are some steps that can be taken to mitigate future operations of this nature.","PeriodicalId":285252,"journal":{"name":"2014 67th Annual Conference for Protective Relay Engineers","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-04-24","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 67th Annual Conference for Protective Relay Engineers","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CPRE.2014.6799014","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Flashover operations due to a change in the physical positioning of a foreign object with an energized conductor are a common occurrence seen throughout many transmission and distribution systems. The inception of a fault from a flashover between two stationary conductors, however, is not as prevalent. This is primarily due to extensive protection system coordination and insulation design specifications that, under anticipated fault conditions, will allow the necessary protection devices to operate, thereby clearing the fault. For Bryan Texas Utilities during the summer of 2013, a particular flashover operation brought about a series of atypical events, which resulted in several operations involving two 138kV transmission lines as well as portions of the 12.5kV distribution system. As presented in the following analysis, it is evident that, while the fault conditions experienced by the system were not within anticipated limits, there are some steps that can be taken to mitigate future operations of this nature.
两条138kV输电线路闪络运行分析
在许多输配电系统中,由于带电导体的异物物理位置的变化而引起的闪络操作是常见的现象。然而,从两个固定导体之间的闪络开始的故障并不普遍。这主要是由于广泛的保护系统协调和绝缘设计规范,在预期的故障条件下,将允许必要的保护装置运行,从而清除故障。对于Bryan Texas公用事业公司来说,2013年夏天,一次特殊的闪络操作引发了一系列非典型事件,导致两条138kV输电线路以及部分12.5kV配电系统发生故障。正如下面的分析所示,很明显,虽然系统所经历的故障条件不在预期范围内,但可以采取一些措施来减轻未来这种性质的操作。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信