Three machines flowshop scheduling model with separate setup times

Neelam Tyagi, R. Tripathi, A. Chandramouli
{"title":"Three machines flowshop scheduling model with separate setup times","authors":"Neelam Tyagi, R. Tripathi, A. Chandramouli","doi":"10.1109/ETCT.2016.7882994","DOIUrl":null,"url":null,"abstract":"In this paper, we have developed a new heuristic algorithm for three machines flowshop scheduling problem using five parameters together. The parameters, which we have used in this paper, are separate setup times, transportation times, Job block, weight of job and specified rental policy. The main aim to introduce this algorithm is to obtain the optimal sequence to minimize the makespan, utilization times and rental cost of the machines. We used the Johnson's Techniques of three machines for developing this heuristic algorithm. A numerical illustration is also provided to verify the effectiveness of developed heuristic algorithm.","PeriodicalId":340007,"journal":{"name":"2016 International Conference on Emerging Trends in Communication Technologies (ETCT)","volume":"22 5 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 International Conference on Emerging Trends in Communication Technologies (ETCT)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ETCT.2016.7882994","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

In this paper, we have developed a new heuristic algorithm for three machines flowshop scheduling problem using five parameters together. The parameters, which we have used in this paper, are separate setup times, transportation times, Job block, weight of job and specified rental policy. The main aim to introduce this algorithm is to obtain the optimal sequence to minimize the makespan, utilization times and rental cost of the machines. We used the Johnson's Techniques of three machines for developing this heuristic algorithm. A numerical illustration is also provided to verify the effectiveness of developed heuristic algorithm.
三台机器流水车间调度模型与单独的设置时间
本文提出了一种新的启发式算法,用于求解5个参数同时存在的三机流水车间调度问题。我们在本文中使用的参数是单独的设置时间,运输时间,工作块,工作权重和指定的租赁政策。该算法的主要目的是求出最优序列,使机器的完工时间、使用时间和租用成本最小。我们使用了三台机器的约翰逊技术来开发这个启发式算法。最后通过数值算例验证了所开发的启发式算法的有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信