{"title":"Operation and economics of a behind-the-meter fuel cell power plant array","authors":"S. Fairfax, N. Dowling","doi":"10.1109/CITRES.2010.5619796","DOIUrl":null,"url":null,"abstract":"A power plant comprising two 200 kW/230 kVA fuel cells was installed and operated over a period of 15 months. Details of the operating experience and economics of the application are discussed.","PeriodicalId":354280,"journal":{"name":"2010 IEEE Conference on Innovative Technologies for an Efficient and Reliable Electricity Supply","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-11-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 IEEE Conference on Innovative Technologies for an Efficient and Reliable Electricity Supply","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/CITRES.2010.5619796","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
A power plant comprising two 200 kW/230 kVA fuel cells was installed and operated over a period of 15 months. Details of the operating experience and economics of the application are discussed.