{"title":"Modifying Existing 138-kV Transmission Towers to 230-kV Capacity","authors":"B. Wood, T. L. Moore","doi":"10.1109/TDC.2006.1668663","DOIUrl":null,"url":null,"abstract":"In order to satisfy growing electrical demand in the San Diego, California area, San Diego Gas and Electric Company (SDG&E) is modifying existing transmission towers to maximize right of way utilization. Recent projects include modifying existing 138-kV towers to 230-kV capacity. Design considerations including construction methods, and electrical and structural requirements are discussed","PeriodicalId":123024,"journal":{"name":"2005/2006 IEEE/PES Transmission and Distribution Conference and Exhibition","volume":"120 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2006-05-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2005/2006 IEEE/PES Transmission and Distribution Conference and Exhibition","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TDC.2006.1668663","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
In order to satisfy growing electrical demand in the San Diego, California area, San Diego Gas and Electric Company (SDG&E) is modifying existing transmission towers to maximize right of way utilization. Recent projects include modifying existing 138-kV towers to 230-kV capacity. Design considerations including construction methods, and electrical and structural requirements are discussed