{"title":"Work","authors":"T. Bastia","doi":"10.4324/9781315555850-5","DOIUrl":null,"url":null,"abstract":"➢ Supervision of the replacement and commissioning of 48Vdc chargers (ELTEK-SFEE) on 8 sites. Production loss reduction to 1 hour. ➢ Involved in the replacement of former protection relays (CEE) by SEPAM. Protection settings optimization. ➢ PCB transformers replacement up to 5MVA (AREVA, France Transfo, OCREV...). ➢ Control and excitation cabinet replacement for 9MW turbo-generators with gas turbine. Supervision of all the electrical performance tests as well as GPC (DEIF) optimization settings. ➢ Reliability improvement for all homopolar protection devices. ➢ Realization and set up of new preventive plans with excel sheets for motors, transformers, chargers and battery with automatic plots of critical parameters versus time.","PeriodicalId":346674,"journal":{"name":"Gender, Migration and Social Transformation","volume":"29 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-05-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Gender, Migration and Social Transformation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4324/9781315555850-5","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

➢ Supervision of the replacement and commissioning of 48Vdc chargers (ELTEK-SFEE) on 8 sites. Production loss reduction to 1 hour. ➢ Involved in the replacement of former protection relays (CEE) by SEPAM. Protection settings optimization. ➢ PCB transformers replacement up to 5MVA (AREVA, France Transfo, OCREV...). ➢ Control and excitation cabinet replacement for 9MW turbo-generators with gas turbine. Supervision of all the electrical performance tests as well as GPC (DEIF) optimization settings. ➢ Reliability improvement for all homopolar protection devices. ➢ Realization and set up of new preventive plans with excel sheets for motors, transformers, chargers and battery with automatic plots of critical parameters versus time.
工作
(四)监管8个站点48Vdc充电器(ELTEK-SFEE)更换及调试。生产损失降低到1小时。五、参与SEPAM对原保护继电器(CEE)的更换。保护设置优化。◆更换PCB变压器最高可达5MVA (AREVA, France Transfo, OCREV…)(四)9MW燃气轮机汽轮发电机组控制、励磁柜更换。监督所有电气性能测试以及GPC (DEIF)优化设置。四、提高所有同极保护装置的可靠性。(五)电机、变压器、充电器、电池等新的预防计划的实现和建立,并提供关键参数随时间的自动绘图。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信