Once through Steam Generator Integrity OTSG

Ghassab Al-Ajmi, Sayed Abulkair, Barzan Mejbel, M. Alrasheedi, A. Al-Awadi, E. Wahba, Mohammed Osman, Reda Abdulaziz
{"title":"Once through Steam Generator Integrity OTSG","authors":"Ghassab Al-Ajmi, Sayed Abulkair, Barzan Mejbel, M. Alrasheedi, A. Al-Awadi, E. Wahba, Mohammed Osman, Reda Abdulaziz","doi":"10.2118/193654-MS","DOIUrl":null,"url":null,"abstract":"\n Kuwait Oil Company (KOC) intends to develop Lower Fars Heavy Oil field on the north of Kuwait that requires steam generation.\n The Lower Fars Heavy Oil (LFHO) Development Project is targeted at a large heavy oil accumulation of approximately 7 to 15 billion barrels oil-in-place located in a desert area of some 1, 200 km2 in North Kuwait. The development of this heavy oil resource is important to Kuwait's production strategy.\n The LFHO reservoir has been partitioned into Well-Blocks; Phase 1 of the LFHO Development Project consists of two such Well-Blocks, which are intended to achieve a target plateau of 60,000 BOPD over a ten-year period from start of operations. This rate will increase after ten years, with future phases ramping up production up to a final plateau of 270,000 BOPD.\n Reservoir engineering work performed to date indicates that phase 1 areas can best be developed by two or three cycles of cyclic steam stimulation (CSS) followed by continuous steam flood (SF) with steam quality of 55% (wells) to 80% central processing facility (CPF). The steam will be generated by multiple Once-Trough Steam Generators (OTSG) located in a central processing facility (CPF).\n The Once through steam generation (OTSG) will use for generating steam utilizing treated boiler feed water to improve recovery of hydrocarbon from a reservoir.\n Integrity process for steam generation equipment considered on Project various stages e.g. equipment selection, design, fabrication, inspection and testing.\n Integrity process also considered during operation process of OTSG units within a defined integrity operating window (IOW) to establish and maintain a controlled process environment which would enable boiler feed water to be converted into steam in a safe, environmentally responsible manner without upsets and planned shutdown.","PeriodicalId":202774,"journal":{"name":"Day 1 Mon, December 10, 2018","volume":"33 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-12-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 1 Mon, December 10, 2018","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/193654-MS","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Kuwait Oil Company (KOC) intends to develop Lower Fars Heavy Oil field on the north of Kuwait that requires steam generation. The Lower Fars Heavy Oil (LFHO) Development Project is targeted at a large heavy oil accumulation of approximately 7 to 15 billion barrels oil-in-place located in a desert area of some 1, 200 km2 in North Kuwait. The development of this heavy oil resource is important to Kuwait's production strategy. The LFHO reservoir has been partitioned into Well-Blocks; Phase 1 of the LFHO Development Project consists of two such Well-Blocks, which are intended to achieve a target plateau of 60,000 BOPD over a ten-year period from start of operations. This rate will increase after ten years, with future phases ramping up production up to a final plateau of 270,000 BOPD. Reservoir engineering work performed to date indicates that phase 1 areas can best be developed by two or three cycles of cyclic steam stimulation (CSS) followed by continuous steam flood (SF) with steam quality of 55% (wells) to 80% central processing facility (CPF). The steam will be generated by multiple Once-Trough Steam Generators (OTSG) located in a central processing facility (CPF). The Once through steam generation (OTSG) will use for generating steam utilizing treated boiler feed water to improve recovery of hydrocarbon from a reservoir. Integrity process for steam generation equipment considered on Project various stages e.g. equipment selection, design, fabrication, inspection and testing. Integrity process also considered during operation process of OTSG units within a defined integrity operating window (IOW) to establish and maintain a controlled process environment which would enable boiler feed water to be converted into steam in a safe, environmentally responsible manner without upsets and planned shutdown.
一旦通过蒸汽发生器完整性OTSG
科威特石油公司(KOC)计划在科威特北部开发Lower Fars稠油油田,该油田需要蒸汽发电。Lower Fars重油(LFHO)开发项目的目标是位于科威特北部约1200平方公里的沙漠地区,储量约为70至150亿桶的大型重油油藏。这一重油资源的开发对科威特的生产战略至关重要。LFHO油藏已划分为多个井块;LFHO开发项目的第一阶段包括两个这样的井块,目的是在开始运营后的十年内实现60,000桶/天的目标平台。这一速度将在10年后增加,未来阶段将产量提高到27万桶/天的最终平台。迄今为止进行的油藏工程工作表明,第一阶段区域的最佳开发方法是进行两到三次循环蒸汽增产(CSS),然后进行连续蒸汽驱(SF),蒸汽质量为55%(井)至80%中央处理设施(CPF)。蒸汽将由位于中央处理设施(CPF)中的多个一次槽蒸汽发生器(OTSG)产生。一次性蒸汽发生器(OTSG)将用于利用处理过的锅炉给水产生蒸汽,以提高油藏中碳氢化合物的采收率。在项目的各个阶段,如设备选择、设计、制造、检验和测试中考虑蒸汽发生设备的完整性过程。在OTSG机组的运行过程中,完整性过程也被考虑在一个定义的完整性操作窗口(IOW)内建立和维持一个受控的过程环境,使锅炉给水能够以安全、环保的方式转化为蒸汽,而不会出现故障和计划停工。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信