Mapping CMMI Project Management Process Areas to SCRUM Practices

A. Marcal, Felipe Santana Furtado Soares, A. D. Belchior
{"title":"Mapping CMMI Project Management Process Areas to SCRUM Practices","authors":"A. Marcal, Felipe Santana Furtado Soares, A. D. Belchior","doi":"10.1109/SEW.2007.102","DOIUrl":null,"url":null,"abstract":"Over the past years, the capability maturity model (CMM) and capability maturity model integration (CMMI) have been broadly used for assessing organizational maturity and process capability throughout the world. However, the rapid pace of change in information technology has caused increasing frustration to the heavyweight plans, specifications, and other documentation imposed by contractual inertia and maturity model compliance criteria. In light of that, agile methodologies have been adopted to tackle this challenge. The aim of our paper is to present mapping between CMMI and one of these methodologies, Scrum. It shows how Scrum addresses the Project Management Process Areas of CMMI. This is useful for organizations that have their plan-driven process based on the CMMI model and are planning to improve its processes toward agility or to help organizations to define a new project management framework based on both CMMI and Scrum practices.","PeriodicalId":277367,"journal":{"name":"31st IEEE Software Engineering Workshop (SEW 2007)","volume":"90 2 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2007-03-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"77","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"31st IEEE Software Engineering Workshop (SEW 2007)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SEW.2007.102","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 77

Abstract

Over the past years, the capability maturity model (CMM) and capability maturity model integration (CMMI) have been broadly used for assessing organizational maturity and process capability throughout the world. However, the rapid pace of change in information technology has caused increasing frustration to the heavyweight plans, specifications, and other documentation imposed by contractual inertia and maturity model compliance criteria. In light of that, agile methodologies have been adopted to tackle this challenge. The aim of our paper is to present mapping between CMMI and one of these methodologies, Scrum. It shows how Scrum addresses the Project Management Process Areas of CMMI. This is useful for organizations that have their plan-driven process based on the CMMI model and are planning to improve its processes toward agility or to help organizations to define a new project management framework based on both CMMI and Scrum practices.
将CMMI项目管理过程域映射到SCRUM实践
在过去的几年里,能力成熟度模型(CMM)和能力成熟度模型集成(CMMI)在世界范围内被广泛用于评估组织成熟度和过程能力。然而,信息技术的快速变化已经引起了对由契约惯性和成熟度模型遵从标准强加的重量级计划、规范和其他文档的越来越大的挫折。鉴于此,敏捷方法已被采用来应对这一挑战。本文的目的是展示CMMI与其中一种方法论Scrum之间的映射关系。它展示了Scrum如何处理CMMI的项目管理过程域。对于那些拥有基于CMMI模型的计划驱动过程并计划改进其过程以实现敏捷性的组织,或者帮助组织定义基于CMMI和Scrum实践的新项目管理框架,这是非常有用的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信