{"title":"Operational performance of the Malaysia-Thailand 300/600 MW HVDC interconnection","authors":"M. Abdullah","doi":"10.1109/PECON.2003.1437465","DOIUrl":null,"url":null,"abstract":"An HVDC operational performance report is prepared annually by utilities operating an HVDC scheme, in accordance to the CIGRE WG14.04 protocol, and submitted to the CIGRE; Study Committee B4 (HVDC and AC power electronic equipment). This Study Committee collates HVDC performance reports from power utility companies worldwide, to be later published in a biennial compendium which is distributed to all the participating utilities. It was envisaged that such information could be useful in the planning, design, construction and operation of new HVDC projects. It was also envisaged that the sharing of the operational performance data could be of benefit to those concerned with the operation and maintenance of existing HVDC schemes or those planning to build new HVDC links. For the period from 1 January to 31 December 2002, a report on the operational performance of the Malaysia-Thailand 300/600 MW HVDC interconnection project was prepared jointly by the designated \"system correspondences\" from Tenaga Nasional Berhad (TNB) and the Electricity Generating Authority of Thailand (EGAT). This paper highlights some of the more important operational parameters calculated and reported to CIGRE, including the energy utilization of the HVDC scheme, energy availability and unavailability and scheduled and forced outages.","PeriodicalId":136640,"journal":{"name":"Proceedings. National Power Engineering Conference, 2003. PECon 2003.","volume":"31 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2003-12-15","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceedings. National Power Engineering Conference, 2003. PECon 2003.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PECON.2003.1437465","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3
Abstract
An HVDC operational performance report is prepared annually by utilities operating an HVDC scheme, in accordance to the CIGRE WG14.04 protocol, and submitted to the CIGRE; Study Committee B4 (HVDC and AC power electronic equipment). This Study Committee collates HVDC performance reports from power utility companies worldwide, to be later published in a biennial compendium which is distributed to all the participating utilities. It was envisaged that such information could be useful in the planning, design, construction and operation of new HVDC projects. It was also envisaged that the sharing of the operational performance data could be of benefit to those concerned with the operation and maintenance of existing HVDC schemes or those planning to build new HVDC links. For the period from 1 January to 31 December 2002, a report on the operational performance of the Malaysia-Thailand 300/600 MW HVDC interconnection project was prepared jointly by the designated "system correspondences" from Tenaga Nasional Berhad (TNB) and the Electricity Generating Authority of Thailand (EGAT). This paper highlights some of the more important operational parameters calculated and reported to CIGRE, including the energy utilization of the HVDC scheme, energy availability and unavailability and scheduled and forced outages.
根据CIGRE WG14.04协议,运营高压直流输电计划的公用事业公司每年准备一份高压直流输电运营绩效报告,并提交给CIGRE;研究委员会B4(高压直流及交流电力电子设备)。该研究委员会整理了来自世界各地电力公司的高压直流性能报告,随后将其出版为两年一次的概要,并分发给所有参与的电力公司。据设想,这些资料可能对新的高压直流输电项目的规划、设计、建造和运营有用。另据设想,共享运行表现数据可能有利于那些关心现有高压直流输电计划的运行和维护或计划建立新的高压直流输电线路的人。2002年1月1日至12月31日期间,由Tenaga national Berhad (TNB)和泰国电力局(EGAT)指定的“系统通信”机构联合编写了一份关于马来西亚-泰国300/600兆瓦高压直流互联项目运行性能的报告。本文重点介绍了计算并报告给CIGRE的一些更重要的运行参数,包括高压直流输电方案的能源利用率,能源可用性和不可用性以及计划和强制停电。