Infrastructure construction for meter test and performance analysis for expired meters based on available period

Seok-gon Kim, Chang-ho Park
{"title":"Infrastructure construction for meter test and performance analysis for expired meters based on available period","authors":"Seok-gon Kim, Chang-ho Park","doi":"10.1109/TD-ASIA.2009.5356913","DOIUrl":null,"url":null,"abstract":"Function and role of electricity meter is changing significantly along with IT technology development. In North America and Europe area, especially, and major electric power companies in the world, demand for mechanical electricity meter is decreasing while electronic electricity meter implementation is continually increasing. Korea Electric Power Corporation (KEPCO), a Korean electric power company, started full scale introducing electronic electricity meter from 2000. Most of the high voltage electricity meters have been changed with electronic type electricity meter. Mechanical electricity meters work as major part in low voltage currently, but these are expected to be changed with the electronic type electricity meter near future. In relation with this situation, future electricity meter operation and maintenance will be focused to electronic type. This study introduce infrastructure construction for the quality improvement of electricity meters, performance analysis for expired meters based on available period, and investigate possibility of extending its lifetime.","PeriodicalId":131589,"journal":{"name":"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific","volume":"5 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-12-18","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 Transmission & Distribution Conference & Exposition: Asia and Pacific","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TD-ASIA.2009.5356913","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Function and role of electricity meter is changing significantly along with IT technology development. In North America and Europe area, especially, and major electric power companies in the world, demand for mechanical electricity meter is decreasing while electronic electricity meter implementation is continually increasing. Korea Electric Power Corporation (KEPCO), a Korean electric power company, started full scale introducing electronic electricity meter from 2000. Most of the high voltage electricity meters have been changed with electronic type electricity meter. Mechanical electricity meters work as major part in low voltage currently, but these are expected to be changed with the electronic type electricity meter near future. In relation with this situation, future electricity meter operation and maintenance will be focused to electronic type. This study introduce infrastructure construction for the quality improvement of electricity meters, performance analysis for expired meters based on available period, and investigate possibility of extending its lifetime.
电表检测基础设施建设,过期电表按有效期限进行性能分析
随着信息技术的发展,电表的功能和作用正在发生重大变化。在北美和欧洲地区,特别是世界各大电力公司,机械式电能表的需求正在减少,而电子式电能表的实施却在不断增加。韩国电力公社从2000年开始全面引进电子电表。大部分高压电表已改为电子式电表。目前机械式电能表是低压工作的主要组成部分,但在不久的将来,机械式电能表有望被电子式电能表所取代。针对这种情况,今后电能表的运行维护将以电子式为主。本文介绍了提高电表质量的基础设施建设,对过期电表的使用寿命进行了性能分析,探讨了延长电表使用寿命的可能性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信