CounterProp Delivering Beneficial Proppant Flowback Mitigation and Improved Well Productivity - A Success Story from Permian

James Cooper, Amit Singh, Christopher Lannen, Amos Kim, Mauro Menconi, Bryce Taylor, Xinghui Liu, Jiehao Wang
{"title":"CounterProp Delivering Beneficial Proppant Flowback Mitigation and Improved Well Productivity - A Success Story from Permian","authors":"James Cooper, Amit Singh, Christopher Lannen, Amos Kim, Mauro Menconi, Bryce Taylor, Xinghui Liu, Jiehao Wang","doi":"10.2118/209138-ms","DOIUrl":null,"url":null,"abstract":"\n Two key goals for proppant selection and injection optimization are economical mitigation of proppant flowback and achieving optimum conductivity throughout fracture area from near wellbore to far field. Improvements in these areas benefit project economics through cost reduction and production uplift. This paper highlights the implementation learnings and success results of CounterProp to reduce proppant flowback and increase near wellbore conductivity in Permian shale and tight development.\n CounterProp proppant injection sequence (large particle size proppant pumped first before small particle size) was introduced by Ely et al (2019) in the paper SPE-194370-MS for slickwater treatment in low permeability shale and tight reservoirs. Two internal studies were carried out to validate CounterProp design impacts. Hydraulic fracture simulation models were completed, and laboratory study was performed to improve understanding of proppant transport behavior and evaluate impact of CounterProp. The laboratory study used large-scale tortuous slot flow equipment with slickwater and different proppant sizes and sequences. The model and laboratory study results indicated that larger proppant settled near wellbore, creating a barrier to prevent smaller proppant grains moving into the wellbore, thereby mitigating proppant flowback and generating higher fracture conductivity in near wellbore area.\n An iterative and phased approach for field implementation was applied to reduce the execution risk of injecting large size 40/70 mesh proppant before small size 100 mesh with slickwater. Multiple field trials have been executed since late 2019 in both the Midland Basin and Delaware Basin. The first trial was implemented in a Lower Spraberry development in Midland Basin where proppant flowback was not an issue, a production uplift was expected with higher near wellbore conductivity, and the perceived execution risk was minimal. In Lower Spraberry, a range of median uplift from 5-42% cumulative oil was measured compared to offset control pads. In Delaware Basin, proppant flowback during early production phase is an issue handled with surface sand separator equipment, and the goal for CounterProp was to reduce the time and cost of sand separator equipment on location. CounterProp was implemented in multiple Wolfcamp developments in Delaware Basin with no execution issues and resulted in decreased proppant production compared to similar developments thereby allowing release of proppant flowback management equipment from these locations approximately 70% earlier, contributing to savings and production benefit with higher pressure drawdown allowed.\n This paper shares a success story from specific examples of CounterProp applications with slickwater in Permian low permeability shale and tight reservoirs. CounterProp field trials have proven as low risk solutions for unconventional development with large potential upside of cost reduction from proppant flowback mitigation and production improvement with higher near wellbore conductivity. Further, application may be broad in Permian development, with low cost, low execution risk, and high benefit to long-term production and operations.","PeriodicalId":224883,"journal":{"name":"Day 2 Wed, February 02, 2022","volume":"155 5 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-01-25","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Wed, February 02, 2022","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/209138-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Two key goals for proppant selection and injection optimization are economical mitigation of proppant flowback and achieving optimum conductivity throughout fracture area from near wellbore to far field. Improvements in these areas benefit project economics through cost reduction and production uplift. This paper highlights the implementation learnings and success results of CounterProp to reduce proppant flowback and increase near wellbore conductivity in Permian shale and tight development. CounterProp proppant injection sequence (large particle size proppant pumped first before small particle size) was introduced by Ely et al (2019) in the paper SPE-194370-MS for slickwater treatment in low permeability shale and tight reservoirs. Two internal studies were carried out to validate CounterProp design impacts. Hydraulic fracture simulation models were completed, and laboratory study was performed to improve understanding of proppant transport behavior and evaluate impact of CounterProp. The laboratory study used large-scale tortuous slot flow equipment with slickwater and different proppant sizes and sequences. The model and laboratory study results indicated that larger proppant settled near wellbore, creating a barrier to prevent smaller proppant grains moving into the wellbore, thereby mitigating proppant flowback and generating higher fracture conductivity in near wellbore area. An iterative and phased approach for field implementation was applied to reduce the execution risk of injecting large size 40/70 mesh proppant before small size 100 mesh with slickwater. Multiple field trials have been executed since late 2019 in both the Midland Basin and Delaware Basin. The first trial was implemented in a Lower Spraberry development in Midland Basin where proppant flowback was not an issue, a production uplift was expected with higher near wellbore conductivity, and the perceived execution risk was minimal. In Lower Spraberry, a range of median uplift from 5-42% cumulative oil was measured compared to offset control pads. In Delaware Basin, proppant flowback during early production phase is an issue handled with surface sand separator equipment, and the goal for CounterProp was to reduce the time and cost of sand separator equipment on location. CounterProp was implemented in multiple Wolfcamp developments in Delaware Basin with no execution issues and resulted in decreased proppant production compared to similar developments thereby allowing release of proppant flowback management equipment from these locations approximately 70% earlier, contributing to savings and production benefit with higher pressure drawdown allowed. This paper shares a success story from specific examples of CounterProp applications with slickwater in Permian low permeability shale and tight reservoirs. CounterProp field trials have proven as low risk solutions for unconventional development with large potential upside of cost reduction from proppant flowback mitigation and production improvement with higher near wellbore conductivity. Further, application may be broad in Permian development, with low cost, low execution risk, and high benefit to long-term production and operations.
反支撑剂可有效缓解支撑剂返排,提高油井产能——二叠盆地的成功案例
支撑剂选择和注入优化的两个关键目标是经济地减缓支撑剂返排,实现从近井到远井整个裂缝区域的最佳导流能力。这些方面的改进通过降低成本和提高产量使项目经济受益。本文重点介绍了CounterProp在二叠系页岩和致密开发中减少支撑剂返排并提高近井导流能力的实施经验和成功结果。Ely等人(2019)在SPE-194370-MS论文中引入了CounterProp支撑剂注入顺序(先泵入大粒径支撑剂,然后再泵入小粒径支撑剂),用于低渗透页岩和致密储层的滑水处理。为了验证CounterProp设计的影响,进行了两项内部研究。完成了水力压裂模拟模型,并进行了实验室研究,以提高对支撑剂运移行为的理解,并评估CounterProp的影响。实验室研究采用大型扭槽流设备,采用滑溜水和不同支撑剂尺寸和序列。模型和实验室研究结果表明,较大的支撑剂在井筒附近沉降,形成屏障,阻止较小的支撑剂颗粒进入井筒,从而减轻支撑剂返排,并在近井筒区域产生更高的裂缝导流能力。采用迭代和分阶段的方法进行现场实施,以降低在小尺寸100目滑溜水之前注入大尺寸40/70目支撑剂的执行风险。自2019年底以来,在Midland盆地和Delaware盆地进行了多次现场试验。第一次试验是在Midland盆地的Lower Spraberry开发中进行的,在那里支撑剂返排不成问题,预计产量会提高,近井导流率更高,执行风险最小。在Lower Spraberry,与偏移控制垫块相比,测量了累积产油量的中位抬升幅度为5-42%。在Delaware盆地,支撑剂返排在早期生产阶段是由地面砂石分离设备处理的问题,CounterProp的目标是减少现场砂石分离设备的时间和成本。CounterProp在Delaware盆地的多个Wolfcamp开发项目中实施,没有出现任何执行问题,但与类似开发项目相比,支撑剂产量有所下降,从而使支撑剂返排管理设备的释放时间提前了约70%,在允许更高的压降的情况下,节省了成本,提高了产量。本文分享了CounterProp在二叠系低渗透页岩和致密储层滑溜水中应用的成功案例。CounterProp的现场试验已被证明是一种低风险的非常规开发解决方案,具有很大的潜在优势,可以通过减少支撑剂返排来降低成本,并通过提高近井导流能力来提高产量。此外,该技术在二叠纪盆地开发中应用广泛,成本低,执行风险低,长期生产和运营效益高。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信
小红书