{"title":"Fully utilizing the intelligent electronic device capability to reduce wiring in rural electric distribution substations","authors":"J. Vico, Terrence Smith, R. Hunt","doi":"10.1109/REPCON.2010.5476202","DOIUrl":null,"url":null,"abstract":"Each wired termination in a substation represents a cost associated with engineering, installing and testing that wired point. These costs include the obvious financial labor costs, but also include intangible costs such as installation and commissioning time, potential for human error, panel space, increased resistive burden in circuits, and larger raceways. Additionally, each wired termination represents stranded engineering time that is used design these terminations rather than allowing the engineering staff to solve problems.","PeriodicalId":303906,"journal":{"name":"2010 IEEE Rural Electric Power Conference (REPC)","volume":"15 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-05-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 IEEE Rural Electric Power Conference (REPC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/REPCON.2010.5476202","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Each wired termination in a substation represents a cost associated with engineering, installing and testing that wired point. These costs include the obvious financial labor costs, but also include intangible costs such as installation and commissioning time, potential for human error, panel space, increased resistive burden in circuits, and larger raceways. Additionally, each wired termination represents stranded engineering time that is used design these terminations rather than allowing the engineering staff to solve problems.
充分利用智能电子设备能力,减少农村配电变电站布线
变电站中的每个有线终端都代表了与该有线点的工程、安装和测试相关的成本。这些成本包括明显的财务劳动力成本,但也包括无形成本,如安装和调试时间、潜在的人为错误、面板空间、电路中增加的电阻负担和更大的滑道。此外,每个有线终端都代表了用于设计这些终端的滞留工程时间,而不是让工程人员解决问题。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信