{"title":"Combining Integrated Project Management with Agile Hydraulic Fracturing Workflow to Successfully Deliver Infill Well Campaign in Heterogeneous Tight Volcanic Reservoir","authors":"V. Ranjan, Akash Damani, Kumar Gaurav, Alok Sharma, Aman Goyal, S. Tiwari, S. Jetley","doi":"10.2118/214094-ms","DOIUrl":null,"url":null,"abstract":"\n Vedanta Ltd, Cairn Oil & Gas operates a tight gas field which produces majorly from the volcanic reservoir. Commercial production is possible post hydraulic fracturing which has been established through successful fracturing campaigns in the past. Hydraulic fracturing in volcanics is a complex operation due to the inherent heterogeneity and associated uncertainty of reservoir properties in these tight formations (~0.1 md). With added challenge of stimulating infill wells landed in partially depleted zones, fracturing becomes the key operation governing the ability to meet production target, project timelines and associated costs.\n Based on new seismic data obtained during field production and previous campaigns, Cairn executed a development campaign and is now following up with an infill campaign to improve and sustain the production plateau in the Raageshwari Gas reservoir. With consideration of economics of the field development, a strong focus on continuous improvement, optimization and developing the subsurface understanding along with lean and integrated project and contract management strategies to improve operational performance were key to achieving project objectives.\n A continuous improvement strategy through production technology initiatives was applied to stimulation campaign by re-designing completion, exhaustive data gathering/analysis and optimizing stage count, proppant volume through machine aided data analytics, testing and clean-up time, minimize hookup time to achieve execution targets and accelerate and maximize production time. Proppant onset calculations and well operating envelop were re-defined to ensure longevity to wells. Apart from summarizing the key learnings of the re-development campaign from a petroleum & completion engineering standpoint, the paper would emphasize on the challenges expected & observed and mitigation methods in the infill campaign - the most noticeable of the challenges being depletion.\n The project resulted in successfully completing 42 wells with ~ 250 frac stages and strategically placing ~ 63 million lb of proppants in gas producing zones. This lead to the production increment of ~ 40% to the overall production which has proven critical to plateau extension. The learnings also form the basis of the future infill campaign.\n Apart from the technical considerations, the paper would expand on the integrated project management strategies which resulted into achieving volume targets within the assigned budget while managing the local considerations and field specific challenges during the execution phase.\n This paper lays out a framework on optimized data collection, evaluation and integration for continuous improvement. It maps the uncertainties associated with highly laminated reservoirs and challenges to look at in an infill campaign. Most importantly the Integrated Contract & Project Management framework would provide operators with valuable insights to execute a frac intensive development/infill campaign within the planned budget/resources.","PeriodicalId":349960,"journal":{"name":"Day 2 Tue, March 14, 2023","volume":"29 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-03-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Day 2 Tue, March 14, 2023","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/214094-ms","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Vedanta Ltd, Cairn Oil & Gas operates a tight gas field which produces majorly from the volcanic reservoir. Commercial production is possible post hydraulic fracturing which has been established through successful fracturing campaigns in the past. Hydraulic fracturing in volcanics is a complex operation due to the inherent heterogeneity and associated uncertainty of reservoir properties in these tight formations (~0.1 md). With added challenge of stimulating infill wells landed in partially depleted zones, fracturing becomes the key operation governing the ability to meet production target, project timelines and associated costs. Based on new seismic data obtained during field production and previous campaigns, Cairn executed a development campaign and is now following up with an infill campaign to improve and sustain the production plateau in the Raageshwari Gas reservoir. With consideration of economics of the field development, a strong focus on continuous improvement, optimization and developing the subsurface understanding along with lean and integrated project and contract management strategies to improve operational performance were key to achieving project objectives. A continuous improvement strategy through production technology initiatives was applied to stimulation campaign by re-designing completion, exhaustive data gathering/analysis and optimizing stage count, proppant volume through machine aided data analytics, testing and clean-up time, minimize hookup time to achieve execution targets and accelerate and maximize production time. Proppant onset calculations and well operating envelop were re-defined to ensure longevity to wells. Apart from summarizing the key learnings of the re-development campaign from a petroleum & completion engineering standpoint, the paper would emphasize on the challenges expected & observed and mitigation methods in the infill campaign - the most noticeable of the challenges being depletion. The project resulted in successfully completing 42 wells with ~ 250 frac stages and strategically placing ~ 63 million lb of proppants in gas producing zones. This lead to the production increment of ~ 40% to the overall production which has proven critical to plateau extension. The learnings also form the basis of the future infill campaign. Apart from the technical considerations, the paper would expand on the integrated project management strategies which resulted into achieving volume targets within the assigned budget while managing the local considerations and field specific challenges during the execution phase. This paper lays out a framework on optimized data collection, evaluation and integration for continuous improvement. It maps the uncertainties associated with highly laminated reservoirs and challenges to look at in an infill campaign. Most importantly the Integrated Contract & Project Management framework would provide operators with valuable insights to execute a frac intensive development/infill campaign within the planned budget/resources.
将综合项目管理与敏捷水力压裂工作流程相结合,成功实施非均质致密火山岩储层充填井作业
Vedanta Ltd, Cairn Oil & Gas经营着一个致密气田,主要产自火山储层。通过过去成功的压裂作业,在水力压裂后实现商业化生产是可能的。由于火山岩致密地层(~0.1 md)的非均质性和储层性质的不确定性,水力压裂是一项复杂的作业。随着部分枯竭区域的增产井面临越来越大的挑战,压裂成为控制生产目标、项目时间表和相关成本的关键操作。基于在现场生产和之前的活动中获得的新地震数据,Cairn进行了一次开发活动,现在正在进行一次填充活动,以改善和维持Raageshwari气藏的生产平台。考虑到油田开发的经济性,重点关注持续改进、优化和发展地下理解,以及精益和集成的项目和合同管理策略,以提高运营绩效,这是实现项目目标的关键。通过生产技术举措,通过重新设计完井、详尽的数据收集/分析、优化级数、通过机器辅助数据分析、测试和清理时间来优化支撑剂体积,将连接时间最小化,以实现执行目标,并加速和最大化生产时间,将持续改进策略应用于增产作业。重新定义了支撑剂起效计算和井作业包膜,以确保井的使用寿命。除了从石油和完井工程的角度总结再开发活动的主要经验之外,本文还将强调在填充活动中预期和观察到的挑战以及缓解方法,其中最明显的挑战是枯竭。该项目成功完成了42口井、250级压裂,并在产气区投放了6300万磅的支撑剂。这使得总产量增加了约40%,这对平台扩展至关重要。这些经验教训也为未来的注水活动奠定了基础。除了技术方面的考虑外,本文还将扩展综合项目管理策略,从而在指定的预算范围内实现数量目标,同时在执行阶段管理当地考虑因素和具体领域的挑战。本文提出了一个优化数据收集、评估和整合的框架,以实现持续改进。它绘制了与高层状油藏相关的不确定性,以及在填充作业中需要考虑的挑战。最重要的是,集成合同和项目管理框架将为运营商提供有价值的见解,以便在计划的预算/资源范围内执行压裂密集开发/填充活动。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信