{"title":"Project management - a more balanced approach","authors":"P. Frijns, F. van Leeuwen, Robert E. Bierwolf","doi":"10.1109/TEMSCON.2017.7998382","DOIUrl":null,"url":null,"abstract":"Within the Dutch government the Gateway Review method has been adopted to facilitate a learning and helping perspective towards owners of high risk programs and projects with a substantial IT component. The current paper reports on findings from data analysis done on Gateway Review reports collected since the introduction of the method in the Ministry of Interior in the Netherlands. The conclusion derived from the data analysis points towards the need for more balance on culture, content, relations and process.","PeriodicalId":193013,"journal":{"name":"2017 IEEE Technology & Engineering Management Conference (TEMSCON)","volume":"19 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2017-06-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"13","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2017 IEEE Technology & Engineering Management Conference (TEMSCON)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/TEMSCON.2017.7998382","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 13
Abstract
Within the Dutch government the Gateway Review method has been adopted to facilitate a learning and helping perspective towards owners of high risk programs and projects with a substantial IT component. The current paper reports on findings from data analysis done on Gateway Review reports collected since the introduction of the method in the Ministry of Interior in the Netherlands. The conclusion derived from the data analysis points towards the need for more balance on culture, content, relations and process.