Simulation Analysis of Temperature and Stress of Rock-anchored Beam during Construction

Jie Liu, Ming-Jie Li, Xiulin Li
{"title":"Simulation Analysis of Temperature and Stress of Rock-anchored Beam during Construction","authors":"Jie Liu, Ming-Jie Li, Xiulin Li","doi":"10.1109/ISTTCA53489.2021.9654787","DOIUrl":null,"url":null,"abstract":"Rock-anchored beam is a common structural form in underground plants of modern large hydropower stations. Due to the long length of the construction section of the rock-anchored beam, the high concrete grade and a large amount of pouring, temperature control and crack prevention are relatively difficult. This paper analyzes the feasibility of water cooling to improve the crack resistance of rock-anchored beam concrete, and puts forward the corresponding measures of temperature control and crack prevention for reference of similar projects.","PeriodicalId":383266,"journal":{"name":"2021 4th International Symposium on Traffic Transportation and Civil Architecture (ISTTCA)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-11-12","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 4th International Symposium on Traffic Transportation and Civil Architecture (ISTTCA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISTTCA53489.2021.9654787","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Rock-anchored beam is a common structural form in underground plants of modern large hydropower stations. Due to the long length of the construction section of the rock-anchored beam, the high concrete grade and a large amount of pouring, temperature control and crack prevention are relatively difficult. This paper analyzes the feasibility of water cooling to improve the crack resistance of rock-anchored beam concrete, and puts forward the corresponding measures of temperature control and crack prevention for reference of similar projects.
岩锚梁施工过程温度与应力模拟分析
岩锚梁是现代大型水电站地下厂房中常见的结构形式。由于岩锚梁施工截面长度长,混凝土标号高,浇筑量大,温度控制和防裂难度较大。分析了水冷却提高岩锚梁混凝土抗裂性的可行性,并提出了相应的控温防裂措施,可供同类工程参考。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信