{"title":"Demonstrate cost savings, schedule shortenings, etc [software project management]","authors":"P. Buitenkant","doi":"10.1109/ELECTR.1996.501206","DOIUrl":null,"url":null,"abstract":"We examine some very specific ways in which a client can realize very dramatic savings, both in schedule and project costs. Bringing in outside resources can either shorten your normal design/development cycle or solve a particularly vexing problem. This allows you, the client to benefit from 4 important considerations: fresh approach by outsider; individual highly skilled in the area of interest; specialised equipment is often made available to the client at little or no cost; and highly motivated to satisfy you, the client.","PeriodicalId":119154,"journal":{"name":"Professional Program Proceedings. ELECTRO '96","volume":"59 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1996-04-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Professional Program Proceedings. ELECTRO '96","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ELECTR.1996.501206","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
We examine some very specific ways in which a client can realize very dramatic savings, both in schedule and project costs. Bringing in outside resources can either shorten your normal design/development cycle or solve a particularly vexing problem. This allows you, the client to benefit from 4 important considerations: fresh approach by outsider; individual highly skilled in the area of interest; specialised equipment is often made available to the client at little or no cost; and highly motivated to satisfy you, the client.