A Study on the Valuation of Early Termination Payment Option of Toll Road PPP Project in the Context of PPP Restructuring: Application of LSMC Simulation
{"title":"A Study on the Valuation of Early Termination Payment Option of Toll Road PPP Project in the Context of PPP Restructuring: Application of LSMC Simulation","authors":"Dong-Seok Kang, Yun W. Park","doi":"10.19172/kreaa.25.4.4","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":378412,"journal":{"name":"The Journal of Korea Real Estate Analysists Association","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-12-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Journal of Korea Real Estate Analysists Association","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.19172/kreaa.25.4.4","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}