{"title":"Branch and Bound Algorithm for the Order Optimization of Parallel Activities in Project Scheduling","authors":"Xing-mei Li, Su-fang Zhang","doi":"10.1109/ICRMEM.2008.106","DOIUrl":null,"url":null,"abstract":"In order to solve the problem of four parallel activities being adjusted to an order chain of three activities and a parallel activity in deterministic activity-on-arc networks of the CPM type, a new theorem and the comparative method of special order chains of three activities are proposed. Based on the theorem and method, a branch and bound algorithm of the decision tree is described. Through the example, the algorithm minimizes the computational effort in enumerating alternative modes.","PeriodicalId":430801,"journal":{"name":"2008 International Conference on Risk Management & Engineering Management","volume":"7 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-11-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 International Conference on Risk Management & Engineering Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICRMEM.2008.106","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
In order to solve the problem of four parallel activities being adjusted to an order chain of three activities and a parallel activity in deterministic activity-on-arc networks of the CPM type, a new theorem and the comparative method of special order chains of three activities are proposed. Based on the theorem and method, a branch and bound algorithm of the decision tree is described. Through the example, the algorithm minimizes the computational effort in enumerating alternative modes.