Risk Analysis of Pemalang District Road and Bridge Construction Delays

Citra Pradipta Hudoyo, Iwan Rustendi, Ika Handayani
{"title":"Risk Analysis of Pemalang District Road and Bridge Construction Delays","authors":"Citra Pradipta Hudoyo, Iwan Rustendi, Ika Handayani","doi":"10.32722/arcee.v4i02.5334","DOIUrl":null,"url":null,"abstract":"Delays in road and bridge construction projects pose significant challenges within the construction industry. These delays can be attributed to various risk factors that have the potential to disrupt project timelines. This study focuses on identifying the risk factors that contribute to delays in road and bridge construction projects in the Pemalang district. A comprehensive review of relevant literature was conducted to identify these risk factors, which were then incorporated into questionnaires distributed among contractors, owners, and consultants. The questionnaire data was analyzed using the mean score ranking method, along with validity and reliability tests, and descriptive statistical analysis facilitated by the SPSS program. The research findings unveiled a total of 54 risk factors categorized into 11 distinct categories. Among these, the top 10 causes of delays in road and bridge construction projects in the Pemalang district were identified based on mean values ranging from 4.18 to 4.57. These factors encompassed issues such as shortages of construction materials (4.57), delays in goods delivery (4.48), equipment delivery delays (4.40), difficulties in contractor funding (4.37), inadequate workforce or inability to meet project demands (4.37), rainfall intensity (4.35), poor material quality (4.30), ordering time inaccuracies (4.27), insufficient skilled labor (4.23), and equipment damage (4.18). Furthermore, interviews were conducted with experts to discuss the 10 risk factors with the highest impact. Strategies to mitigate these risks were derived from these discussions. The outcomes of this research are anticipated to provide valuable insights for stakeholders involved in the planning and execution of road and bridge construction projects. By understanding the underlying risk factors and implementing the recommended strategies, it is expected that project delays can be significantly reduced in future endeavors.","PeriodicalId":378971,"journal":{"name":"Applied Research on Civil Engineering and Environment (ARCEE)","volume":"62 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-06-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Applied Research on Civil Engineering and Environment (ARCEE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.32722/arcee.v4i02.5334","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Delays in road and bridge construction projects pose significant challenges within the construction industry. These delays can be attributed to various risk factors that have the potential to disrupt project timelines. This study focuses on identifying the risk factors that contribute to delays in road and bridge construction projects in the Pemalang district. A comprehensive review of relevant literature was conducted to identify these risk factors, which were then incorporated into questionnaires distributed among contractors, owners, and consultants. The questionnaire data was analyzed using the mean score ranking method, along with validity and reliability tests, and descriptive statistical analysis facilitated by the SPSS program. The research findings unveiled a total of 54 risk factors categorized into 11 distinct categories. Among these, the top 10 causes of delays in road and bridge construction projects in the Pemalang district were identified based on mean values ranging from 4.18 to 4.57. These factors encompassed issues such as shortages of construction materials (4.57), delays in goods delivery (4.48), equipment delivery delays (4.40), difficulties in contractor funding (4.37), inadequate workforce or inability to meet project demands (4.37), rainfall intensity (4.35), poor material quality (4.30), ordering time inaccuracies (4.27), insufficient skilled labor (4.23), and equipment damage (4.18). Furthermore, interviews were conducted with experts to discuss the 10 risk factors with the highest impact. Strategies to mitigate these risks were derived from these discussions. The outcomes of this research are anticipated to provide valuable insights for stakeholders involved in the planning and execution of road and bridge construction projects. By understanding the underlying risk factors and implementing the recommended strategies, it is expected that project delays can be significantly reduced in future endeavors.
宝马垄地区道路桥梁施工延误风险分析
道路和桥梁建设项目的延误对建筑行业构成了重大挑战。这些延迟可以归因于有可能破坏项目时间表的各种风险因素。这项研究的重点是确定导致槟榔屿地区道路和桥梁建设项目延误的风险因素。对相关文献进行了全面的审查,以确定这些风险因素,然后将其纳入承包商,业主和顾问之间分发的问卷。问卷数据分析采用平均分排序法,并进行效度和信度检验,利用SPSS软件进行描述性统计分析。研究结果揭示了总共54个风险因素,分为11个不同的类别。其中,根据4.18至4.57的平均值确定了Pemalang地区道路和桥梁建设项目延误的十大原因。这些因素包括建筑材料短缺(4.57)、货物交付延迟(4.48)、设备交付延迟(4.40)、承包商资金困难(4.37)、劳动力不足或无法满足项目需求(4.37)、降雨强度(4.35)、材料质量差(4.30)、订购时间不准确(4.27)、熟练工人不足(4.23)和设备损坏(4.18)。此外,还与专家进行了访谈,讨论了影响最大的10个风险因素。从这些讨论中产生了减轻这些风险的战略。预计本研究的结果将为参与道路和桥梁建设项目规划和执行的利益相关者提供有价值的见解。通过了解潜在的风险因素和实施推荐的策略,可以预期在未来的努力中显著减少项目延迟。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术官方微信