Best-case analysis for improving the worst-case schedulability test for distributed hard real-time systems

J.C. Palencia Gutierrez, J. Javier Gutiérrez, M. González Harbour
{"title":"Best-case analysis for improving the worst-case schedulability test for distributed hard real-time systems","authors":"J.C. Palencia Gutierrez, J. Javier Gutiérrez, M. González Harbour","doi":"10.1109/EMWRTS.1998.684945","DOIUrl":null,"url":null,"abstract":"We present an improvement of the schedulability analysis technique for distributed hard real time systems that allows us to increase the maximum schedulable resource utilization. Since the improvement affects only the analysis technique, there is no additional implementation cost for the application itself. The improvement in the analysis consists of calculating a lower bound for the best case response time of tasks and messages, in order to reduce the estimated jitter in the activation of subsequent tasks and messages. This reduction of jitter implies reduced worst case bounds for the response times, and thus allows us to increase the maximum schedulable utilization. The paper explores two different ways to calculate a lower bound on the best case execution times. The paper also shows the results of simulations that we have carried out, in which we found that we could increase the maximum schedulable limit of the different resources by approximately 5% more utilization.","PeriodicalId":318810,"journal":{"name":"Proceeding. 10th EUROMICRO Workshop on Real-Time Systems (Cat. No.98EX168)","volume":"24 23 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"14","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Proceeding. 10th EUROMICRO Workshop on Real-Time Systems (Cat. No.98EX168)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EMWRTS.1998.684945","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 14

Abstract

We present an improvement of the schedulability analysis technique for distributed hard real time systems that allows us to increase the maximum schedulable resource utilization. Since the improvement affects only the analysis technique, there is no additional implementation cost for the application itself. The improvement in the analysis consists of calculating a lower bound for the best case response time of tasks and messages, in order to reduce the estimated jitter in the activation of subsequent tasks and messages. This reduction of jitter implies reduced worst case bounds for the response times, and thus allows us to increase the maximum schedulable utilization. The paper explores two different ways to calculate a lower bound on the best case execution times. The paper also shows the results of simulations that we have carried out, in which we found that we could increase the maximum schedulable limit of the different resources by approximately 5% more utilization.
改进分布式硬实时系统最坏情况可调度性测试的最佳案例分析
我们提出了一种改进的分布式硬实时系统的可调度性分析技术,使我们能够提高可调度资源的最大利用率。由于改进只影响分析技术,因此对应用程序本身没有额外的实现成本。分析中的改进包括计算任务和消息的最佳情况响应时间的下界,以减少激活后续任务和消息时估计的抖动。这种抖动的减少意味着响应时间的最坏情况边界的减少,从而允许我们增加最大可调度利用率。本文探讨了计算最佳情况下执行时间下界的两种不同方法。本文还展示了我们所进行的模拟结果,在模拟中我们发现,我们可以将不同资源的最大可调度限制提高约5%的利用率。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信