Modeling a Conceptual Framework for Owner-Contractor Relationship and Time-Cost Trade-Off Using Fuzzy Logic Techniques

M. A. Al Hazza, Mohammad Al Fadel, E. Adesta
{"title":"Modeling a Conceptual Framework for Owner-Contractor Relationship and Time-Cost Trade-Off Using Fuzzy Logic Techniques","authors":"M. A. Al Hazza, Mohammad Al Fadel, E. Adesta","doi":"10.1109/ACSAT.2014.38","DOIUrl":null,"url":null,"abstract":"This paper proposes a conceptual framework for owner- contractor relationship and time-cost trade-off analysis of construction project control system using fuzzy logic approach. Construction projects require a well-defined starting point and well-defined finish point with accurate resource allocation to avoid any cost overrun. During the life cycle of the project, different problems can appear. The most important ones are delay and construction cost overrun during the executing phase of the project. To avoid that, an effective planning system with effective control technique is a crucial issue. The main objectives of this research are to develop and design a conceptual framework that may be a guide for the contractor and the owner for controlling the construction projects. The results show that a good conceptual framework need to start with breaking down the project in conjunction with analyzing the cost and time to have both the contractor and the owner the better and less risk in having a good proposal in time, cost and quality. However the final framework show that a need for continuous feedback from the owner to the contractor during the planning process and also can help in designing and developing a proposal that satisfy both the contractor and the owner in terms in time, cost and quality. Risk assessment should be one of the main factors that should be considered during all steps in monitoring, planning and controlling the project. Finally a simulation has been done using the Fuzzy logic approach to validate the conceptual framework).","PeriodicalId":137452,"journal":{"name":"2014 3rd International Conference on Advanced Computer Science Applications and Technologies","volume":"40 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2014-12-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2014 3rd International Conference on Advanced Computer Science Applications and Technologies","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ACSAT.2014.38","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

Abstract

This paper proposes a conceptual framework for owner- contractor relationship and time-cost trade-off analysis of construction project control system using fuzzy logic approach. Construction projects require a well-defined starting point and well-defined finish point with accurate resource allocation to avoid any cost overrun. During the life cycle of the project, different problems can appear. The most important ones are delay and construction cost overrun during the executing phase of the project. To avoid that, an effective planning system with effective control technique is a crucial issue. The main objectives of this research are to develop and design a conceptual framework that may be a guide for the contractor and the owner for controlling the construction projects. The results show that a good conceptual framework need to start with breaking down the project in conjunction with analyzing the cost and time to have both the contractor and the owner the better and less risk in having a good proposal in time, cost and quality. However the final framework show that a need for continuous feedback from the owner to the contractor during the planning process and also can help in designing and developing a proposal that satisfy both the contractor and the owner in terms in time, cost and quality. Risk assessment should be one of the main factors that should be considered during all steps in monitoring, planning and controlling the project. Finally a simulation has been done using the Fuzzy logic approach to validate the conceptual framework).
基于模糊逻辑技术的业主-承包商关系和时间-成本权衡的概念框架建模
本文运用模糊逻辑方法,提出了建设项目控制系统中业主-承包商关系和时间-成本权衡分析的概念框架。建设项目需要明确的起点和终点,准确的资源配置,避免成本超支。在项目的生命周期中,可能会出现不同的问题。其中最主要的是工程实施阶段的延误和工程造价超支。为了避免这种情况,一个有效的计划系统和有效的控制技术是一个关键问题。本研究的主要目标是开发和设计一个概念框架,可以作为承包商和业主控制建设项目的指南。结果表明,一个好的概念框架需要从分解项目开始,结合分析成本和时间,使承包商和业主在时间、成本和质量上都能得到一个好的建议,并降低风险。然而,最终的框架表明,在规划过程中,业主需要向承包商提供持续的反馈,这也有助于设计和制定一个在时间、成本和质量方面同时满足承包商和业主的方案。风险评估应该是在监视、计划和控制项目的所有步骤中应考虑的主要因素之一。最后利用模糊逻辑方法进行了仿真,验证了概念框架的有效性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信