The use of threshold logic to improve performance in scheduling a manufacturing process

E. T. Farley, D. Haworth
{"title":"The use of threshold logic to improve performance in scheduling a manufacturing process","authors":"E. T. Farley, D. Haworth","doi":"10.1109/REG5.1988.15890","DOIUrl":null,"url":null,"abstract":"Simulation and threshold logic are used to demonstrate the feasibility of a learning system that increases production output. Production is simulated with a discrete, next-event model having multiple paths and multiple processes on each path. Switches located throughout the model can direct production units to avoid bottlenecks and improve output. Each switch in the model is controlled by the action of threshold gates. For the process time configurations tested, minima were found to be associated with one or more of three threshold values set in 92% of the configurations. Using the three threshold value sets and a rule base for process time configurations that are not optimized by one of the three sets, a system may be created that avoids the computational costs and time delays of a multiple-trial optimizing system.<<ETX>>","PeriodicalId":126733,"journal":{"name":"IEEE Region 5 Conference, 1988: 'Spanning the Peaks of Electrotechnology'","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1988-03-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Region 5 Conference, 1988: 'Spanning the Peaks of Electrotechnology'","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/REG5.1988.15890","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Simulation and threshold logic are used to demonstrate the feasibility of a learning system that increases production output. Production is simulated with a discrete, next-event model having multiple paths and multiple processes on each path. Switches located throughout the model can direct production units to avoid bottlenecks and improve output. Each switch in the model is controlled by the action of threshold gates. For the process time configurations tested, minima were found to be associated with one or more of three threshold values set in 92% of the configurations. Using the three threshold value sets and a rule base for process time configurations that are not optimized by one of the three sets, a system may be created that avoids the computational costs and time delays of a multiple-trial optimizing system.<>
使用阈值逻辑来提高制造过程调度的性能
仿真和阈值逻辑用于证明学习系统提高生产产量的可行性。生产是用一个离散的下一个事件模型来模拟的,该模型具有多条路径和每个路径上的多个流程。位于整个模型中的开关可以指导生产单元避免瓶颈并提高产量。模型中的每个开关由阈值门的作用控制。对于测试的流程时间配置,发现最小值与92%的配置中设置的三个阈值中的一个或多个相关联。使用三个阈值集和一个未被三个集之一优化的过程时间配置的规则库,可以创建一个系统,以避免多次试验优化系统的计算成本和时间延迟。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信