A Critical Evaluation of Failure in a Nearshore Outsourcing Project: What Dilemma Analysis Can Tell Us

T. Clear, Bilal Raza, Stephen G. MacDonell
{"title":"A Critical Evaluation of Failure in a Nearshore Outsourcing Project: What Dilemma Analysis Can Tell Us","authors":"T. Clear, Bilal Raza, Stephen G. MacDonell","doi":"10.1109/ICGSE.2013.31","DOIUrl":null,"url":null,"abstract":"Global Software Engineering (GSE) research contains few examples consciously applying what Glass and colleagues have termed an 'evaluative-critical' approach. In this study we apply dilemma analysis to conduct a critical review of a major (and ongoing) near shore Business Process Outsourcing project in New Zealand. The project has become so troubled that a Government Minister has recently been assigned responsibility for troubleshooting it. The 'Novo pay' project concerns the implementation of a nationwide payroll system responsible for the payment of some 110,000 teachers and education sector staff. An Australian company won the contract for customizing and implementing the Novo pay system, taking over from an existing New Zealand service provider. We demonstrate how a modified form of dilemma analysis can be a powerful technique for highlighting risks and stakeholder impacts from empirical data, and that adopting an evaluative-critical approach to such projects can usefully highlight tensions and barriers to satisfactory project outcomes.","PeriodicalId":175455,"journal":{"name":"2013 IEEE 8th International Conference on Global Software Engineering","volume":"12 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2013-08-26","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"13","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2013 IEEE 8th International Conference on Global Software Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICGSE.2013.31","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 13

Abstract

Global Software Engineering (GSE) research contains few examples consciously applying what Glass and colleagues have termed an 'evaluative-critical' approach. In this study we apply dilemma analysis to conduct a critical review of a major (and ongoing) near shore Business Process Outsourcing project in New Zealand. The project has become so troubled that a Government Minister has recently been assigned responsibility for troubleshooting it. The 'Novo pay' project concerns the implementation of a nationwide payroll system responsible for the payment of some 110,000 teachers and education sector staff. An Australian company won the contract for customizing and implementing the Novo pay system, taking over from an existing New Zealand service provider. We demonstrate how a modified form of dilemma analysis can be a powerful technique for highlighting risks and stakeholder impacts from empirical data, and that adopting an evaluative-critical approach to such projects can usefully highlight tensions and barriers to satisfactory project outcomes.
近岸外包项目失败的关键评估:困境分析的启示
全球软件工程(GSE)研究包含了几个有意识地应用Glass及其同事所称的“关键评估”方法的例子。在这项研究中,我们运用困境分析对新西兰的一个主要(和正在进行的)近岸业务流程外包项目进行了批判性审查。这个项目遇到了很大的麻烦,以至于最近指派了一名政府部长负责解决这个问题。“Novo薪酬”项目涉及实施全国工资制度,负责支付约11万名教师和教育部门工作人员的工资。一家澳大利亚公司赢得了定制和实施Novo支付系统的合同,取代了一家现有的新西兰服务提供商。我们展示了一种改进形式的困境分析如何成为一种强有力的技术,可以从经验数据中突出风险和利益相关者的影响,并且对此类项目采用评估关键方法可以有效地突出紧张关系和障碍,从而实现令人满意的项目结果。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信