{"title":"Study on the Method of Integrated Energy Planning for Business Park","authors":"Feng Mengshuang, Zhang Zhichang, Xie Dian, Ding Danjun, Cheng Jiejun, Chen Qian, S. Qiang","doi":"10.1109/ICSGEA.2019.00029","DOIUrl":null,"url":null,"abstract":"Business park is a typical zone with heating-and-cooling load and electrical load as main load. As the industrial upgrading accompanied by the production capacity upgrading and the trade of high percentage of renewable energy, business park is suitable to use the method of integrated energy planning to integrate the production, transmission, storage and consumption to realize multi-energy complementarity and improve energy utilization efficiency. This paper studies the load characteristics of the business park, and focus on the model of integrated energy planning for business park, and provides a pareto optimal solution for the multi-objective planning for business park at last. Based on a real case for a business park, we give a planning method for integrated energy. It includes forecasting the load, setting five scenarios, giving an optimized planning and running a simulation, the results prove that this method can provide good guidance for integrated energy planning for other similar business parks.","PeriodicalId":201721,"journal":{"name":"2019 International Conference on Smart Grid and Electrical Automation (ICSGEA)","volume":"119 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2019 International Conference on Smart Grid and Electrical Automation (ICSGEA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICSGEA.2019.00029","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Business park is a typical zone with heating-and-cooling load and electrical load as main load. As the industrial upgrading accompanied by the production capacity upgrading and the trade of high percentage of renewable energy, business park is suitable to use the method of integrated energy planning to integrate the production, transmission, storage and consumption to realize multi-energy complementarity and improve energy utilization efficiency. This paper studies the load characteristics of the business park, and focus on the model of integrated energy planning for business park, and provides a pareto optimal solution for the multi-objective planning for business park at last. Based on a real case for a business park, we give a planning method for integrated energy. It includes forecasting the load, setting five scenarios, giving an optimized planning and running a simulation, the results prove that this method can provide good guidance for integrated energy planning for other similar business parks.