{"title":"The Solution of Bi-Criteria Flow Shop Scheduling Problem through Mathematical Modelling and its Application in a Shoe Factory","authors":"Serkan Kaya, Aye Çelik","doi":"10.1504/ejie.2024.10057892","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":314867,"journal":{"name":"European J. of Industrial Engineering","volume":"20 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"European J. of Industrial Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1504/ejie.2024.10057892","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}