Hydro-Québec’s new approach for asset management

A. Delavari, J. Prévost, M. Gaha, Amira Dems
{"title":"Hydro-Québec’s new approach for asset management","authors":"A. Delavari, J. Prévost, M. Gaha, Amira Dems","doi":"10.1109/PESGM41954.2020.9281936","DOIUrl":null,"url":null,"abstract":"Hydro-Québec TransÉnergie (HQT) has been employing predictive modelling methods to manage its assets for over a decade. To meet new needs and to respond to changes in the energy market, HQT undertakes an important research project in order to improve existing tools for asset management and modelling system. In this paper, we present a quick review of the global asset management model at HQT. Furthermore, we introduce a Contingency Analysis (CA) approach which will be integrated in the reliability simulator module of the HQT global asset management model. To this end, we augment the traditional bus-branch data model to provide a detailed node-breaker representation that contains detailed nodes, breakers and other switching devices. Then, we analyze the impact of the equipment unavailability on the network behaviour using a detailed CA approach. This contingency analysis approach not only informs the asset management engineers in case of violations, but also suggests several remedial actions to eliminate the violation.","PeriodicalId":106476,"journal":{"name":"2020 IEEE Power & Energy Society General Meeting (PESGM)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2020-08-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 IEEE Power & Energy Society General Meeting (PESGM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PESGM41954.2020.9281936","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

Hydro-Québec TransÉnergie (HQT) has been employing predictive modelling methods to manage its assets for over a decade. To meet new needs and to respond to changes in the energy market, HQT undertakes an important research project in order to improve existing tools for asset management and modelling system. In this paper, we present a quick review of the global asset management model at HQT. Furthermore, we introduce a Contingency Analysis (CA) approach which will be integrated in the reliability simulator module of the HQT global asset management model. To this end, we augment the traditional bus-branch data model to provide a detailed node-breaker representation that contains detailed nodes, breakers and other switching devices. Then, we analyze the impact of the equipment unavailability on the network behaviour using a detailed CA approach. This contingency analysis approach not only informs the asset management engineers in case of violations, but also suggests several remedial actions to eliminate the violation.
hydro - quamesbec的资产管理新方法
hydro - qu TransÉnergie (HQT)公司十多年来一直采用预测建模方法来管理其资产。为了满足新的需求和应对能源市场的变化,HQT承担了一项重要的研究项目,以改进现有的资产管理和建模系统工具。在本文中,我们简要回顾了HQT的全球资产管理模型。此外,我们还介绍了一种权变分析(CA)方法,该方法将集成在HQT全球资产管理模型的可靠性模拟器模块中。为此,我们扩展了传统的总线-分支数据模型,以提供详细的节点-断路器表示,其中包含详细的节点、断路器和其他交换设备。然后,我们使用详细的CA方法分析了设备不可用对网络行为的影响。这种偶然性分析方法不仅在违规的情况下通知资产管理工程师,而且还建议一些补救措施来消除违规。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信