{"title":"Final Account Preparation in Construction Industry: Competencies and Challenges of Quantity Surveyors","authors":"Nur Khairina Khairul Hisham, M. K. F. Othman","doi":"10.24191/IJSMS.V6I1.12877","DOIUrl":null,"url":null,"abstract":"Final account in a construction project is prepared to show the final cost of the project that has been completed by a contractor. Preparation of the final account involves reporting the final cost of construction works, and it is one of the services that must be provided by quantity surveyors. Quantity surveyors display their competencies in preparing a final account by producing the certificate without being disputed and in a timely manner. However, issues and problems usually occur when rolling the final account, often related to quantity surveyors’ competencies. This paper aims to study challenges faced and competencies displayed by quantity surveyors in relation to the final account preparation. An extensive literature review of previous research and content analysis of court cases reported in the Malayan Law Journal were conducted to identify challenges and competencies of quantity surveyors in preparing a final account. In addition, a questionnaire survey was conducted among quantity surveyors to elicit their agreement on the issues and required competencies during the final account preparation. Three categories of issues pertaining to the final account preparation were observed: contractor-related; management-related; and contractual-related issues. This research also revealed six categories of competencies required in a final account preparation: procurement; quantification and costing; project finance control; contract administration; construction practice; and teamwork. Correlation analysis conducted shows that management related issues are likely to occur due to low competencies displayed by quantity surveyors during the preparation of the final account. This research is expected to provide the knowledge related to the preparation of the final account by quantity surveyors, leading to a more satisfactory construction project deliverance.","PeriodicalId":334569,"journal":{"name":"International Journal of Service Management and Sustainability","volume":"41 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-03-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"International Journal of Service Management and Sustainability","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24191/IJSMS.V6I1.12877","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Final account in a construction project is prepared to show the final cost of the project that has been completed by a contractor. Preparation of the final account involves reporting the final cost of construction works, and it is one of the services that must be provided by quantity surveyors. Quantity surveyors display their competencies in preparing a final account by producing the certificate without being disputed and in a timely manner. However, issues and problems usually occur when rolling the final account, often related to quantity surveyors’ competencies. This paper aims to study challenges faced and competencies displayed by quantity surveyors in relation to the final account preparation. An extensive literature review of previous research and content analysis of court cases reported in the Malayan Law Journal were conducted to identify challenges and competencies of quantity surveyors in preparing a final account. In addition, a questionnaire survey was conducted among quantity surveyors to elicit their agreement on the issues and required competencies during the final account preparation. Three categories of issues pertaining to the final account preparation were observed: contractor-related; management-related; and contractual-related issues. This research also revealed six categories of competencies required in a final account preparation: procurement; quantification and costing; project finance control; contract administration; construction practice; and teamwork. Correlation analysis conducted shows that management related issues are likely to occur due to low competencies displayed by quantity surveyors during the preparation of the final account. This research is expected to provide the knowledge related to the preparation of the final account by quantity surveyors, leading to a more satisfactory construction project deliverance.
建筑行业的决算准备:工料测量师的能力和挑战
建筑项目的决算是用来显示承包商已经完成的工程的最终成本。编制决算涉及报告建筑工程的最终成本,这是工料测量师必须提供的服务之一。工料测量师通过在没有争议的情况下及时出示证书来显示他们在准备最终账目方面的能力。然而,问题和问题通常发生在滚动最终账户时,通常与工料测量师的能力有关。本文旨在研究工料测量师在决算编制方面面临的挑战和表现出的能力。广泛的文献回顾以前的研究和法院案件的内容分析报告在马来亚法律杂志进行,以确定挑战和能力的工料测量师在准备一个最终帐户。此外,还对工料测量员进行了问卷调查,以征求他们对编制最后决算期间的问题和所需能力的意见。观察到与最后决算编制有关的三类问题:与承包商有关的;管理相关的;以及与合同有关的问题。这项研究还揭示了编制决算所需的六类能力:采购;量化和成本核算;项目财务控制;合同管理;建设实践;和团队合作。相关分析表明,由于工料测量师在编制决算时表现出较低的能力,很可能出现管理相关问题。本研究旨在为工料测量师提供编制决算的相关知识,从而使建筑项目的交付更加令人满意。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信