Assessment of insulation condition of hydro generator stator bars after 40 years in service

T. Klamt, T. Hillmer, François Vannay
{"title":"Assessment of insulation condition of hydro generator stator bars after 40 years in service","authors":"T. Klamt, T. Hillmer, François Vannay","doi":"10.1109/EIC.2011.5996155","DOIUrl":null,"url":null,"abstract":"Long-term field experience and the knowledge of the condition of stator bar insulation after long periods of operation are key points for ensuring reliable operation of stator windings. The ALSTOM Micadur® insulation system, first introduced for generators in 1958, has such long-term field experience. This system is in service over the whole power range of hydro and turbo generators, represented by a fleet of more than 10,000 machines between 5 MVA and 1944 MVA. ALSTOM had the opportunity to investigate the condition of 8 operation-aged Micadur® bars of a hydro generator, since the owner was replacing the stator core and stator winding.","PeriodicalId":129127,"journal":{"name":"2011 Electrical Insulation Conference (EIC).","volume":"83 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-06-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 Electrical Insulation Conference (EIC).","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EIC.2011.5996155","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

Long-term field experience and the knowledge of the condition of stator bar insulation after long periods of operation are key points for ensuring reliable operation of stator windings. The ALSTOM Micadur® insulation system, first introduced for generators in 1958, has such long-term field experience. This system is in service over the whole power range of hydro and turbo generators, represented by a fleet of more than 10,000 machines between 5 MVA and 1944 MVA. ALSTOM had the opportunity to investigate the condition of 8 operation-aged Micadur® bars of a hydro generator, since the owner was replacing the stator core and stator winding.
水轮发电机定子棒运行40年后绝缘状况评价
长期的现场经验和长时间运行后对定子棒绝缘状况的了解是保证定子绕组可靠运行的关键。阿尔斯通Micadur®绝缘系统于1958年首次为发电机推出,具有长期的现场经验。该系统在整个水力和涡轮发电机的功率范围内服务,由超过10,000台机器组成,在5 MVA和1944 MVA之间。由于业主正在更换定子铁芯和定子绕组,阿尔斯通有机会调查水力发电机8个运行老化的Micadur®棒的状况。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 求助全文
来源期刊
自引率
0.00%
发文量
0
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
确定
请完成安全验证×
copy
已复制链接
快去分享给好友吧!
我知道了
右上角分享
点击右上角分享
0
联系我们:info@booksci.cn Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。 Copyright © 2023 布克学术 All rights reserved.
京ICP备2023020795号-1
ghs 京公网安备 11010802042870号
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术官方微信